JOHNSON CONTROLS
98
FORM 155.30-ICOM2.EN.UL
ISSUE DATE: 12/21/2018
SECTION 5 - COMMISSIONING
JOHNSON CONTROLS
5
FORM 155.30-CL1.EN.UL
ISSUE DATE: 12/11/2018
D. Remote Operation Check
1. Check that the chiller starts and stops using a remote
signal. .......................................................................
E. Operation Instruction
Review the operation and maintenance instructions in
the manual with the customer. ......................................
a. Customer Names:
1.
2.
3.
NOTES:
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
Customer Signature: _______________________________________
Form Completed by: _______________________________________
_______________________________________
Title:
: _____________ / ____________ /
___________
Month
Day
Year