background image

DISCONNECT SWITCH BRACKET
FOR UNITS WITH OPTIONAL BELT-DRIVE BLOWER

A special bracket for mounting a field-supplied disconnect
switch is provided in each unit ordered with an optional
belt-drive supply air blower. The bracket is shipped inside the
blower compartment taped to the top of the blower housing.

Install the bracket on the left hand side of the unit as shown in
Figure 5. Several existing screws at the top of the unit and one
screw approximately midway down from the top will be used
for mounting the bracket. Screws should be loosened only -
NOT REMOVED. Matching holes in the bracket have
elongated keyways allowing easy installation. Re-tighten
screws after bracket is in place to ensure panels will remain
leak tight.

FIG. 4 - TYPICAL FIELD WIRING

TYPICAL CONTROL WIRING

REFER TO THE APPROPRIATE
ELECTRICAL DATA TABLE TO
SIZE THE DISCONNECT SWITCH,
OVERCURRENT PROTECTION
AND WIRING.

TYPICAL POWER WIRING

24 VOLT

TRANSFORMER

UNIT TERMINAL

STRIP TB1

THERMOSTAT

1

TERMINALS

1

 24 VOLT THERMOSTAT 2TH08701024. IF THE UNIT HAS AN ECONOMIZER,

  REMOVE JUMPER J1 FROM TERMINALS 8 AND 10 ON THE RELAY BOARD
  TO PREVENT SIMULTANEOUS OPERATION OF THE SCROLL COMPRESSOR
  AND THE ECONOMIZER. IF YOU WANT TO CONTROL THE ECONOMIZER ON
  A SECOND STAGE OF COOLING, USE THERMOSTAT 2TH04701224.

COOLING ONLY (24 VOLT THERMOSTAT)

THERMOSTAT

1

TERMINALS

UNIT TERMINAL

STRIP TB1

24 VOLT

TRANSFORMER

ADD
JUMPER

1

 24 VOLT THERMOSTAT 2TH07701024. IF THE UNIT HAS AN ECONOMIZER,

  REMOVE JUMPER J1 FROM TERMINALS 8 AND 10 ON THE RELAY BOARD
  TO PREVENT SIMULTANEOUS OPERATION OF THE SCROLL COMPRESSOR
  AND THE ECONOMIZER. IF YOU WANT TO CONTROL THE ECONOMIZER
  ON A SECOND STAGE OF COOLING OR HAVE AN ELECTRIC HEAT
  ACCESSORY WITH TWO STAGES OF HEAT, USE THERMOSTAT 2TH04701024
  OR 2TH04701524 (WITH SUBBASE 2TB04700224 OR 2TB04700324).

COOLING / HEATING (24 VOLT THERMOSTAT)

24 VOLT

TRANSFORMER

UNIT TERMINAL

STRIP TB1

THERMOSTAT

1

TERMINALS

ADD
JUMPER

ADD
JUMPER

4

2

3

4

NOT
USED

TO REMOTE SENSOR
2TH04702224 IF USED

1

 ELECTRONIC PROGRAMMABLE THERMOSTAT 2ET04700224 (INCLUDES SUBBASE)

   TO CONTROL ECONOMIZER ON SECOND STAGE OF COOLING, REMOVE JUMPER
   J1 FROM TERMINALS 8 AND 10 ON THE RELAY BOARD.

2

 SECOND STAGE COOLING IS NOT REQUIRED ON UNITS LESS ECONOMIZER.

3

 SECOND STAGE HEATING IS ONLY REQUIRED ON UNITS WITH A TWO STAGE

   ELECTRIC HEATER.

4

 REMOVE JUMPER J2 FROM TERMINALS 4 AND 9 ON JUMPER PLUG CONNECTOR

   P6 ON UNITS WITH ECONOMIZER. TERMINALS A1 AND A2 PROVIDE A RELAY
  OUT-PUT TO CLOSE THE OUTDOOR ECONOMIZER DAMPERS WHEN THE
  THERMOSTAT SWITCHES TO THE SET-BACK POSITION.

COOLING / HEATING (ELECTRONIC THERMOSTAT)

24 VOLT

TRANSFORMER

THERMOSTAT

1

TERMINALS

ADD
JUMPER

UNIT TERMINAL

STRIP TB1

1

 ELECTRONIC PROGRAMMABLE THERMOSTAT 2ET07701024 (INCLUDES SUBBASE).

  IF THIS UNIT HAS AN ECONOMIZER, REMOVE JUMPER J1 FROM TERMINALS 8 AND
  10 ON THE RELAY BOARD TO PREVENT SIMULTANEOUS OPERATION OF THE
  SCROLL COMPRESSOR AND THE ECONOMIZER. IF YOU WANT TO CONTROL THE
  ECONOMIZER ON A SECOND STAGE OF COOLING, USE THERMOSTAT 2ET04700224.

COOLING / HEATING (ELECTRONIC THERMOSTAT)

530.18-N7Y

6

Unitary Products Group

Summary of Contents for Sunline 2000

Page 1: ...equipment All forms referenced in this instruction may be ordered from Publications Distribution Center Unitary Products Group P O Box 1592 York PA 17405 APPROVALS Design certified by U L and C G A a...

Page 2: ...rf 5 6 Ton Belt Drive 10 6 Static Resistances 11 7 Motor and Drive Data Belt Drive 11 8 Electrical Data Direct Drive 11 9 Electrical Data Belt Drive 11 10 Supperheat 036 12 11 Supperheat 048 12 12 Sup...

Page 3: ...d with a forklift Slotted openings in the base rails are provided for this purpose LENGTH OF FORKS MUST BE A MINIMUM OF 42 Remove the nesting brackets from the four corners on top of the unit All scre...

Page 4: ...wiring diagram Electrical lines must be sized properly to carry the load USE COPPER CONDUCTORS ONLY Each unit must be wired with a separate branch circuit fed directly from the meter panel and proper...

Page 5: ...hood flange and tighten Attach the two side plates to the unit panel by using two self drilling screws for each side plate at dimples D provided in the panel 6 Position fillpiece at bottom of hood be...

Page 6: ...UNIT HAS AN ECONOMIZER REMOVE JUMPER J1 FROM TERMINALS 8 AND 10 ON THE RELAY BOARD TO PREVENT SIMULTANEOUS OPERATION OF THE SCROLL COMPRESSOR AND THE ECONOMIZER IF YOU WANT TO CONTROL THE ECONOMIZER O...

Page 7: ...roper size of the supply and return air duct connections SCROLL COMPRESSOR ACCESS 111 2 45 8 3 77 8 61 2 171 2 111 2 171 2 REAR VIEW SIDE SUPPLY AND RETURN AIR OPENINGS UNIT BASE WITH RAILS FRONT VIEW...

Page 8: ...D LOW 1684 1487 800 710 1631 1464 780 690 1699 1582 1421 825 750 670 1650 1524 1367 785 720 650 1570 1410 1315 755 690 620 1430 1324 1246 725 650 605 1360 1260 1185 700 630 590 1280 1185 1110 680 610...

Page 9: ...ATIC RESISTANCES TABLE FOR RESISTANCE VALUES ON APPLICATIONS OTHER THAN GAS ELECTRIC UNITS WITH SIDE DUCT AIRFLOWS UNIT SIZE AIR FLOW CFM Available External Static Pressure IWG 0 20 0 30 0 40 0 50 0 6...

Page 10: ...re IWG 0 20 0 30 0 40 0 50 0 60 0 70 0 80 RPM Watts RPM Watts RPM Watts RPM Watts RPM Watts RPM Watts RPM Watts 060 2500 1059 1560 1077 1590 1095 1630 1114 1650 1134 1660 1158 1685 1181 1720 2400 1032...

Page 11: ...S MIN MAX RLA LRA 036 208 230 1 60 208 230 3 60 460 3 60 575 3 60 187 187 414 518 253 253 504 630 18 0 11 4 6 2 5 0 105 0 90 0 45 0 36 0 1 3 1 3 0 8 0 8 4 4 4 4 2 2 2 2 28 2 20 0 10 8 9 3 45 30 15 15...

Page 12: ...5 2 17 4 19 5 21 6 23 7 25 6 27 5 29 5 31 4 80 7 5 9 6 11 7 13 9 16 0 18 2 20 3 22 6 24 8 27 1 29 3 85 6 1 8 3 10 4 12 6 14 8 16 9 19 5 22 1 24 7 27 3 90 6 6 8 2 9 8 11 4 13 0 16 1 19 1 22 2 25 2 95 5...

Page 13: ...24 1 27 2 28 7 30 2 31 7 33 2 80 5 2 8 5 11 7 15 0 18 2 21 4 24 7 26 3 27 9 29 6 31 2 85 5 3 8 7 12 0 15 4 18 8 22 2 23 9 25 7 27 4 29 2 90 5 1 7 7 10 4 13 0 15 7 18 4 20 7 23 1 25 4 27 8 95 6 8 8 7...

Page 14: ...for heating by the thermostat b Upon a call for heat by the thermostat the first stage of heat will be energized Sequencer 1S or contactor 2M is always the first and last to complete its timing cycle...

Page 15: ...removed in Step 1 NOTE DE ENERGIZE THE SCROLL COMPRESSORS BE FORE TAKING ANY TEST MEASUREMENTS TO ASSURE A DRY INDOOR COIL SECURE OWNER S APPROVAL When the system is functioning properly secure the ow...

Page 16: ...air circuit Cleaning should be as often as necessary to keep coil clean Use a brush vacuum cleaner attachment or other suitable means If water is used to clean coil be sure power to the unit is shut o...

Reviews: