4
INSTALLATION DIAGRAM
INSTALLATION OF THE OUTDOOR UNIT
The outdoor unit must be installed in such a way,
so as to prevent short circuit of the hot discharged
air or obstruction to the smooth air flow. Please
follow the installation clearances shown in the
figure. Select the coolest possible place where
intake air temperature is not greater than the
outside air temperature (maximum 45°C).
Indoor Unit
Front panel
Outdoor Unit
50mm or more from walls
(on both sides)
30mm or more from ceiling
Caulk pipe
hole gap
with putty.
Cut thermal insulation
pipe to an appropriate
length and wrap it with
tape, making sure that no
gap is left in the insulation
pipe’s cut line.
Wrap the insulation pipe with
the finishing tape from bottom
to top.
M4 x 12L
Air filter
Air filter
Air-Purifying Filter
with bacteriostatic
virustatic function
Filter frame
Tab
Air-Purifying Filter with bacteriostatic
virustatic function (2)
Service lid
Opening service lid
Service lid is opening/
closing type.
Opening method
1) Remove the service lid
screws.
2) Pull out the service lid
diagonally down in the
direction of the arrow.
3) Pull down.
Dimension
A
B
C
Minimum Distance,
300
300
500
mm (in)
(11.8)
(11.8) (19.7)
Installation clearances
Obstacle
Return air
Service access
Obstacle
Obstacle
Return air
Dischar
ge air
A
B
C
Note:
If there is any obstacle higher than 2m, or
if there is any obstruction at the upper part of the
unit, please allow more space than the figure
indicated in the above table.
250mm from wall