WARNING: This is not a backseating valve. The service access

port has a valve core. Opening or closing valve
does not close service access port.

Valve can be opened by removing the plunger cap and fully
inserting a hex wrench into the stem and backing out counter-
clockwise until valve stem just touches retaining ring. See
Figure 7.

CAUTION:  If visual verification to the valve stem reaching the

retaining ring is impossible, stop backing out the
valve stem when the slightest increase in resis-
tance is felt. Because of the small size and there-
fore the reduced resistance, back out the liquid
valve 5 turns maximum to prevent going past the
retaining ring.

WARNING:  If the valve stem is backed out past the retaining

ring, the O’ring can be damaged causing leakage
or system pressure could force the valve stem out
of the valve body possibly causing personal injury.
In the event the retaining ring is missing, do not
attempt to open the valve.

Replace plunger cap finger tight, then tighten an additional 1/12
turn (1/2 hex flat). Cap must be replaced to prevent leaks.

LINE INSTALLATION PROCEDURE

Install the refrigerant lines using the following procedure:

1. Remove the cap and Schrader core from both the liquid and

vapor fitting service ports at the outdoor unit. Connect low
pressure nitrogen to the liquid line service port.

2. Braze the liquid line to the liquid fitting at the outdoor unit.

Be sure to wrap the fitting body with a wet rag. Allow the
nitrogen to continue flowing.

3. Carefully remove the rubber plugs from the evaporator

liquid and vapor connections. Use caution, since the evapo-
rator is pressurized.

4. Braze the liquid line to the evaporator liquid connection. The

nitrogen should now be flowing through the evaporator coil.

5. Remove the grommet from the vapor connection at the coil.

Braze the vapor line to the evaporator vapor connection.
After the connection has cooled, replace the grommet.

6. Protect the vapor fitting with a wet rag and braze the vapor

line connection. The nitrogen flow should be exiting the
system from the vapor service port connection. After This
connection has cooled, remove the nitrogen source from
the liquid fitting service port and replace schrader cores.

7. Evacuate the vapor line, evaporator and the liquid line, to

1000 microns or less.

CAUTION: Do not use the system refrigerant in the outdoor

unit to purge or leak test.

8. Leak test all refrigerant piping connections including the serv-

ice port flare caps to be sure they are leak tight. DO NOT
OVER TIGHTEN (between 40 and 60 inch - lbs. maximum).

9. Do not remove the flare caps from the service ports except

when necessary for servicing the system.

CAUTION: Do not connect manifold gauges unless trouble is

suspected. Approximately 3/4 ounce of refrigerant
will be lost each time a standard manifold gauge is
connected.

10. Release refrigerant charge into the system. Open both the

liquid and vapor fittings by removing the plunger cap and
with an allen wrench back out counter-clockwise until valve
stem just touches retaining ring. See Base Valve Connec-
tion Precautions.

11. The sweat connect outdoor unit contains enough refriger-

ant charge for a matched evaporator and 15 feet of tubing.
Refer to the Table 2 for the amount of additional charge
required for some mix-matched evaporators. Additional
charge for lines longer than 15 feet is shown in Table 3. If
additional charge is required, see recommended charging
methods.

ROOM THERMOSTAT

Cooling units may be installed with any conventional thermo-
stat. The thermostat should be located about 5 ft. above the
floor, where it will be exposed to normal room air circulation.
Do not place it on an outside wall or where it is exposed to the
radiant effect from exposed glass or appliances, drafts from
outside doors or supply air grilles.

Mount the thermostat and route the 24-volt control wiring (NEC
Class 2) from the thermostat to the indoor and outdoor units.

FIGURE 6 - HEAT PROTECTION

FIGURE 7 - PLUNGER CAP

SERVICE PORT WITH SCHRADER CORE

PLUNGER
CAP

550.36-N2Y

Unitary Products Group

5

Summary of Contents for H2DH024S06

Page 1: ...The unit should be installed in accordance with all national and local safety codes Limitations for the indoor unit coil and appropriate accessories must also be observed For piping limitations and a...

Page 2: ...ERHEAD NEC CLASS 2 WIRING Sit unit on rubber elevator grommets to reduce noise and allow for proper drainage FIGURE 1 TYPICAL INSTALLATION MODEL H2DH024 H2DH030 H2DH036 H2DH042 H2DH048 H2DH060 UNIT SU...

Page 3: ...shown Sweat coils are shipped with a standard orifice in a plastic bag attached to the liquid line connection The orifice that is shipped with the coil is based on the most sold combination but it ma...

Page 4: ...The total system refrigerant charge is retained within the outdoor unit during shipping and installation The re usable service valves are provided to evacuate and charge per this instruction Serious s...

Page 5: ...the vapor fitting with a wet rag and braze the vapor line connection The nitrogen flow should be exiting the system from the vapor service port connection After This connection has cooled remove the...

Page 6: ...H2DH060 UNITORIFICE S 61 63 65 75 78 78 81 84 90 93 93 96 FACTORYR 22 CHARGE LBS OZ SWEAT 5 7 5 0 7 12 8 0 11 14 13 0 INDOOR COIL COIL ORIFICE REQUIRED SYSTEM ORIFICE ADDITIONAL CHARGE OZ G3HC G1FC02...

Page 7: ...urate weighing device is available add refrigerant accordingly CAUTION Compressor damage will occurif system is improp erly charged On new system installations charge system per R 22 charge informatio...

Page 8: ...73 75 77 79 79 2 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 82 4 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 Saturation Temperature TABLE 5 Temperature and Pressure TEMP F PRESSU...

Page 9: ...re the thermostat is set to operate the compressor CAUTION An attempt to start the compressor without at least 8 hours of crankcase heat will damage the com pressor A warning label with an adhesive ba...

Page 10: ...0 60 65 70 75 80 85 90 95 SUCTION PRESSURE PSIG LIQUID PRESSURE PSIG 115 F O D AMBIENT 95 F O D AMBIENT 036 036 036 75 F O D AMBIENT 048 060 042 042 EXAMPLE H2DH036 unit with a 76 PSIG measured suc ti...

Page 11: ...mine if the system is operating properly 1 The outdoor fan should be running with warm air being discharged from the top of the unit 2 The indoor blower furnace or air handler will be operating discha...

Page 12: ...ducts Group P O Box 1592 York Pennsylvania USA 17405 1592 Subject to change without notice Printed in U S A Copyright by York International Corporation 1995 All Rights Reserved RPC 8M 695 66 Code SBY...

Reviews: