background image

835964-UIM-A-0112

Johnson Controls Unitary Products

5

SECTION IV: ORIFICE INSTALLATION

Install Schrader Valve Core and Orifice as follows:

1.

Slide indoor coil out of cabinet far enough to gain access to equal-
izer fitting on the suction line.

2.

After holding charge is completely discharged remove black plas-
tic cap on equalizer fitting.

3.

Install Schrader Valve Core supplied with the outdoor unit into
equalizer fitting using a valve core tool.

4.

Loosen and remove the liquid line fitting from the orifice distributor
assembly. Note that the fitting has right hand threads.

5.

Install proper size orifice supplied with outdoor unit. Refer to sup-
plied Tabular Data Sheet for specific orifice size and indoor coil
match up.

6.

After orifice is installed reinstall the liquid line to the top of the ori-
fice distributor assembly. Hand tighten and turn an additional 1/8
turn to seal. Do not over tighten fittings.

7.

Leak test system.

8.

Replace black plastic cap on equalizer fitting.

9.

Slide indoor coil back into cabinet.

SECTION V: TXV INSTALLATION

The following are the basic steps for installation. For detailed instruc-
tions, refer to the Installation Instructions accompanying the TXV kit.
Install TXV kit as follows:

1.

Relieve the holding charge by pulling off the rubber cap plug on
the suction manifold line of the coil.

2.

After holding charge is completely discharged, loosen and remove
the Schrader cap seal.

3.

Loosen and remove distributor cap seal.

4.

Install the thermal expansion valve to the orifice distributor assem-
bly with supplied fittings. Hand tighten and turn an additional 1/4
turn to seal. Do not overtighten fittings.

5.

Install the liquid line to the top of the thermal expansion valve with
fitting supplied with the liquid line. Hand modify the liquid line to
align with casing opening. Hand tighten the liquid line and an addi-
tional 1/4 turn to seal.

6.

Install the TXV equalizer line into the vapor line as follows:

a.

Hand tighten the 1/4” SAE nut to the Schrader fitting and an
additional 1/3 turn to seal.

7.

Install the TXV bulb to the vapor line near the equalizer line, using
the bulb clamp(s) furnished with the TXV assembly. Ensure the
bulb is making maximum contact.

a.

Bulb should be installed on a horizontal run of the vapor line if
possible. The bulb should be installed on top of the line.

b.

If bulb installation is made on a vertical run, the bulb should
be located at least 16” (40.6 cm) from any bend, and on the
tubing sides opposite the plane of the bend. The bulb should
be positioned with the bulb tail at the top, so that the bulb acts
as a reservoir.

c.

Bulb should be insulated using thermal insulation provided to
protect it from the effect of the surrounding ambient tempera-
ture. Cover completely to insulate from air-stream.

SECTION VI: EVACUATION

It will be necessary to evacuate the system to 500 microns or less. If a
leak is suspected, leak test with dry nitrogen to locate the leak. Repair
the leak and test again.

To verify that the system has no leaks, simply close the valve to the vac-
uum pump suction to isolate the pump and hold the system under vac-
uum. Watch the micron gauge for a few minutes. If the micron gauge
indicates a steady and continuous rise, it’s an indication of a leak. If the
gauge shows a rise, then levels off after a few minutes and remains
fairly constant, it’s an indication that the system is leak free but still con-
tains moisture and may require further evacuation if the reading is
above 500 microns.

Failure to install Schrader Valve Core on orifice applications could
result in total refrigerant loss of the system!

 FIGURE 5:  

Orifice Installation

When using a TXV, 13 SEER models 12-48 require a hard start kit.
Models 12-48 with a “H” on the end of the model number have a
factory installed hard start.

LIQUID LINE
SWIVEL COUPLING
(This fitting is a right-hand thread,
turn counter-clockwise to remove)

ORIFICE

DISTRIBUTOR

Only 1TVM900 series valves are to be used on this product.

 In all cases, mount the TXV bulb after vapor line is brazed and has
had sufficient time to cool.

Schrader valve core MUST NOT be installed with TXV installation.
Poor system performance or system failure could result.

Summary of Contents for 13 Seer-GCGD

Page 1: ...hazardous situation which if not avoided will result in death or serious injury WARNING indicates a potentially hazardous situation which if not avoided could result in death or serious injury CAUTIO...

Page 2: ...410A coil con densing unit combination with the appropriate metering device 2 Change out of the line set when replacing an R 22 unit with an R410 A unit is highly recommended to reduce cross contamina...

Page 3: ...o avoid sharp bends which may cause a restriction 2 The lines should be installed so that they will not obstruct service access to the coil air handling system or filter 3 Care must also be taken to i...

Page 4: ...ER TIGHTEN between 40 and 60 inch lbs maximum 10 Evacuate the vapor line evaporator and liquid line to 500 microns or less 11 Replace cap on service ports Do not remove the flare caps from the service...

Page 5: ...r fitting and an additional 1 3 turn to seal 7 Install the TXV bulb to the vapor line near the equalizer line using the bulb clamp s furnished with the TXV assembly Ensure the bulb is making maximum c...

Page 6: ...e default subcool ing is 10 F 1 Set the system running in cooling mode by setting the thermostat at least 6 F below the room temperature and operate system for at least 10 15 minutes 2 Refer to the te...

Page 7: ...ly connections TABLE 2 R 410A Saturation Properties TEMP F PRESSURE PSIG TEMP F PRESSURE PSIG TEMP F PRESSURE PSIG TEMP F PRESSURE PSIG TEMP F PRESSURE PSIG 45 130 60 170 75 217 90 274 105 341 46 132...

Page 8: ...unit and thermostat To eliminate erratic operation seal the hole in the wall at the ther mostat with permagum or equivalent to prevent air drafts affecting the operation of in the thermostat NOTICE FI...

Page 9: ...electric heat on thermostat is not necessary MA SHP AHP ID MODELS Other Part Numbers SAP Legacy 265902 031 09167 2 Part Numbers SAP Legacy 159480 031 09156 1 COM 24 Volt Common R 24 Volt Hot W2 Secon...

Page 10: ...Y1 Single Stage Compressor Y Y2 Second or Full Stage Compressor W1 First Stage Heat Y Full Stage Compressor G Fan BP11C50124 BN11C01124 DP11C40124 DN11C00124 THERMOSTAT RH 24 Volt Hot Heat XFMR RC 24...

Page 11: ...ll Stage Heat Clipping Jumper W914 for electric heat on thermostat is not necessary 24VAC Humidifier Optional C 24 Volt Common Y Compressor SINGLE STAGE AIR CONDITIONER Y Compressor Contactor SINGLE S...

Page 12: ...rmostat is not necessary C 24 Volt Common Y Full Stage Compressor G Fan BN11C00124 THERMOSTAT RH 24 Volt Hot Heat XFMR RC 24 Volt Hot Cool XFMR W Full Stage Heat Thermostat Installer Setup 1 System Ty...

Page 13: ...ration and maintenance of all other system components MAINTENANCE 1 Dirt should not be allowed to accumulate on the outdoor coils or other parts in the air circuit Clean as often as necessary to keep...

Page 14: ...835964 UIM A 0112 14 Johnson Controls Unitary Products SECTION X WIRING DIAGRAM FIGURE 14 Wiring Diagram Single Phase 167242...

Page 15: ...835964 UIM A 0112 Johnson Controls Unitary Products 15 FIGURE 15 Wiring Diagram Three Phase 412217...

Page 16: ...ge without notice Published in U S A 835964 UIM A 0112 Copyright 2012 by Johnson Controls Inc All rights reserved Supersedes 414172 UIM D 1211 Johnson Controls Unitary Products 5005 York Drive Norman...

Reviews: