<6. PROCEDURES FOR CONVERTER OPERATION>
6-1
IM 12E04A02-02E
6. PROCEDURES FOR CONVERTER
OPERATION
The converter incorporates a microprocessor and has automatic cleaning, automatic
zerocalibration, and self-diagnostic functions as well as turbidity measuring functions.
The operator may use the control panel to enable display of various date, manual operation of
solenoid valves, etc., or entry of operation parameters.
This chapter describes key operation procedures, details of indications on the display, etc.
6.1 Components of Control Panel and Their
Functions and Actions
Access to all function in obtained through keys on the control panel. The panel includes display
areas for data, modes, function codes, etc. in which measured values and operating statuses are
displayed.
Figure 6.1 and Table 6.1 show the control panel components and their functions.
mg/l
FTU
nA mA
V %
MEAS.
MAINT
PROGRAM 1
PROGRAM 2
FAIL
LAMP AMG1 AMG2 AMG3 SV1 SV2 SV3 SV4
FUNC
FUNC
ENT
<
>
>
MODE
DATA SET
SV 1
MANUAL OPERATION
SV 2
SV 3
SV 4
HOLD CAL WASH
(5) <FAIL> indication
(1) Data display
(6) Operation
indication area 1
(7) Operation indication area 2
(4) Unit indication
area
(2) Function code
display area
(10) Function key
(12) Valve operation keys
(11) Data set
keys
(9) Mode key
(8) Status
indication area
(3) Mode indication
area
F0601.ai
Figure 6.1 Control Panel
3rd Edition : May. 31, 2010-00
Summary of Contents for Vigilant Plant EXA TB Series
Page 49: ...Blank Page ...
Page 59: ...Blank Page ...
Page 119: ...Blank Page ...
Page 125: ...Blank Page ...
Page 127: ...Blank Page ...
Page 133: ...Blank Page ...