User’s
Manual
Contents
1. Introduction
For Safe Use of Product ..............................................2
Warranty ......................................................................4
ATEX Documentation ..................................................5
Model and Specifications Check
.................................7
Selecting the Installation Location
..............................7
..................................................7
Installation of an Explosion-Protected Instrument
..................................... 27
Pressure Equipment Directive (PED) ...................... 28
Safety Requirement Standards ................................ 29
Mounting................................................................... 30
......................................30
Diaphragm Seals Installation Consideration
Mounting the Flushing Connection Ring
............................................. 33
Rotating Transmitter Section .................................... 34
Changing the Direction of Integral Indicator
Impulse Piping Installation Precautions
Impulse Piping Connection Examples
Process Piping Installation Precautions (EJ
Wiring Precautions ................................................... 40
Connections of External Wiring to Terminal Box
Wiring ....................................................................... 43
RTD Cable Connection (EJX910A/EJX930A)
Grounding ................................................................ 47
Power Supply Voltage and Load Resistance
Preparation for Starting Operation ........................... 48
Zero Point Adjustment .............................................. 48
.......................................... 49
EJX and EJA-E Series
Differential Pressure and
Pressure Transmitters
Installation Manual
IM 01C25A01-01E
IM 01C25A01-01E
12th Edition