Call:
+44 (0)1268 570900
Fax:
+44 (0)1268 732509
Email:
Visit:
www.yewdale.co.uk
5
8
.
To remove any surplus trucks from the ready linked stacks, cut the metal
spacer line 5mm ahead of the leading truck.
9
.
Using the chart below, insert the appropriate tubular spacers (927007W)
onto the drive end of the spline.
10
.
Loading the trucks onto the spline, with the links facing away from the drive
end of the control set, insert a stop ring (927010), onto the spline between
the first and second truck.
11
.
Sliding all the trucks fully home, against the drive end of the control set,
fix the stop ring in place using a slotted screwdriver to hold the first truck
captive.
12
.
Attach the cord drive runner (927005W), to the leading truck (truck furthest
away from the control end).
VL30 89mm Single draw
VL30 127mm Single draw
Control End
Control End
0
1