YASKAWA
TOEPC71061782C GA800 Drive Installation & Primary Operation
31
2.
Wire the closed-loop crimp terminal to the main circuit terminal block.
Figure 7.9 Install the Electrical Wire
3.
Tighten the nut to the specified torque.
Figure 7.10 Tighten the Terminal Block Nut
4.
Put the terminal cover back in its initial position.
8
Keypad: Names and Functions
Figure 8.1 Keypad