background image

16522

STOP!

STOP!

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

1-800-844-9273

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

Summary of Contents for WESTMONT GABLE 12' x 16'

Page 1: ...embly or product information call our toll free number 1 800 844 9273 or email customerservice yardline net Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Sa...

Page 2: ...This page intentionally left blank...

Page 3: ...lding ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level su...

Page 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Page 5: ...Below is a list of additional materials not included x4 x16 2 x 4 x 12 5 x 10 x 365 7 cm Treated Lumber Cut to 3 2 x 4 x 141 5 x 10 x 358 1 cm ea 3 7 6 cm Hot Dipped Galvanized Nails Optional 12 30 5...

Page 6: ...5 1 x 10 2 x 20 3 cm COA x4 3 8 x 1 3 4 x 81 7 8 1 0 x 4 4 x 208 cm x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 3 4 1 9 cm 1 x 3 x 5 2 5 x 7 6 x 12 7 cm Gauge Block for 3 4 1 9 cm measurement x1 GAA DOOR O...

Page 7: ...x1 x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 2 x 4 x 48 5 1 x 10 2 x 122 cm SP x4 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x7 WALL PANEL DOORS PARTS LIST x11 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 RIGHT DOOR...

Page 8: ...3 4 1 9 cm 2 5 0 cm 3 7 6 cm 2 5 1 cm 1 1 2 3 8 cm x2 1 2 5 cm x2 x1 64 Metal Threshold 3 4 1 9 cm x11 Bagged seperately special coating x12 1 2 5 cm x4 x4 x8 x4 3 8 x5 1 2 1 cm x 14 cm 3 8 1 cm 3 8...

Page 9: ...concrete foundation see the following page CONCRETE MATERIAL REQUIRED x4 4 x 4 x 12 10 x 10 x 365 8 cm Treated Lumber Fasteners for Frame to 4 x 4 3 Screws shown as one option Minimum 78 3 screws ext...

Page 10: ...g approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7 days 2 x 4 x 8 5 1 x 10 2 x 243 8 c...

Page 11: ...d mark BEGIN You have finished your floor frame Proceed to level and square frame FINISH Flush Flush You will need to cut 2 x 4 x 144 boards down to 141 x2 2 x 4 x 144 5 1 x 10 2 x 365 7 cm Look for S...

Page 12: ...ment will be approximately 240 609 6 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame S...

Page 13: ...l and squaring frame Fig C Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The measurement will be approxim...

Page 14: ...part on edges and 12 apart inside panels 5 7 6 x4 5 8 x 48 x 96 1 6 x 122 x 243 8 cm x2 5 8 x 47 7 8 x 48 1 6 x 121 9 x 122 cm x258 2 5 1 cm FLOOR PANELS Grid lines up 5 8 x 48 x 96 1 6 x 122 x 243 8...

Page 15: ...floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the...

Page 16: ...the floor deck using two 3 screws Fig A Measure over 144 3 4 and install a second CLA flush to the floor deck Secure using two 3 screws Fig A It is very important to assemble your rafters using the f...

Page 17: ...ch a second gusset using glue and 12 2 nails No need to use jig for this gusset 4 3 2 Keep DNB firm against outside CLA s as shown Fig A and push rafters tight to the middle Rafters should touch at ti...

Page 18: ...AP 1 4 1 9 cm GAP DNB x2 ECN x2 Fig A Fig B Fig C Glue where gusset installs Keep rafters firmly against CLA at both ends when securing gusset You have finished assembling your rafters Gable end rafte...

Page 19: ...1 x 10 2 x 170 1 cm AM Center OSB on top of AM Glue both sides of OSB Nail using 3 nails in the pattern shown Place another AM on top of OSB 2 3 1 BEGIN You have assembled your door header FINISH 1 O...

Page 20: ...75 FOR WINDOW INSTALLATION OPTIONAL DOOR LOCATED ON EAVE SIDE WALL toward right EAVE SIDE WALL WITH OFFSET DOORS IF YOU CHOOSE TO LOCATE THE DOOR TOWARD THE RIGHT LEFT GO TO Page 23 TO BEGIN BUILDING...

Page 21: ...ENAILING x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x8 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x4 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x1 3 7 16 x 4 x 67 8 7 x 10 2 x 170 2 cm PRE ASSEMBLED DOOR HEADER x3 2 x...

Page 22: ...d on frame 20 3 EAVE SIDE WALL WITH DOOR CENTERED PARTS REQUIRED 3 7 6 cm x20 Orient parts on edge on floor as shown Use two 3 nails as shown x2 2 x 4 x 68 1 2 5 x 10 2 x 174 cm YFA YFA 3 7 6 cm Nails...

Page 23: ...g 2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever mo...

Page 24: ...apart inside panel 8 You have finished building your door wall Finish x136 EAVE SIDE WALL WITH DOOR CENTERED PARTS REQUIRED 2 5 1 cm 10 9 Carefully flip the door wall over 6 15 2 cm 6 15 2 cm 48 121...

Page 25: ...to the DOOR HEADER TK x8 TP SP SP DOOR HEADER x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x8 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x4 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x3 2 x 4 x 8 5 1 x 10 2 x 20 3 cm COA...

Page 26: ...frame 24 3 EAVE SIDE WALL WITH OFFSET DOOR RIGHT SHOWN PARTS REQUIRED 3 7 6 cm x20 Orient parts on edge on floor as shown Use two 3 nails as shown x2 2 x 4 x 68 1 2 5 x 10 2 x 174 cm YFA YFA 3 7 6 cm...

Page 27: ...using 2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lev...

Page 28: ...T SHOWN PARTS REQUIRED 2 5 1 cm 10 9 Carefully flip the door wall over Repeat STEP 8 for 48 x 84 right door panel 3 4 1 9 cm 3 4 1 9 cm 48 121 9 cm 12 30 5 cm 6 15 2 cm 6 15 2 cm 48 x 84 121 9 x 213 4...

Page 29: ...80 203 2 cm 68 1 2 174 0 cm 44 1 2 113 0 cm 34 1 4 87 0 cm 20 1 2 52 0cm COA x3 TK x6 3 7 6 cm Nails STL STL TJ TJ 137 348 cm 137 348 cm 1 1 2 3 8 cm TOENAILING DOOR HEADER 8 20 3cm PARTS REQUIRED x4...

Page 30: ...x 10 2 x 174 cm YFA 28 HINT For easier nailing stand on frame PARTS REQUIRED 3 7 6 cm x20 GABLE END WALL WITH DOOR 3 Orient parts on edge Use two 3 nails at each location YFA YFA 3 7 6 cm Nails Two na...

Page 31: ...ark the 3 4 measurement on the wall stud Secure panel with two 2 nails 6 15 2 cm apart Repeat STEP 4 to attach the right 48 x 84 panel 5 4 3 4 GAUGE BLOCK GAA 48 x 84 121 9 x 213 4 cm x1 LEFT 1 RIGHT...

Page 32: ...rame with primed side up as shown Secure panel with two 2 nails 6 apart Repeat STEP 6 to attach the right 23 7 8 x 84 panel 7 6 You have finished building gable end door wall FINISH 23 7 8 x 84 60 6 x...

Page 33: ...o 3 nails at each mark and four 3 nails at seams Orient parts on edge on floor Measure and mark 2 TK x9 SP SP SP SP TP TP TOENAILING x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x9 2 x 4 x 80 5 1 x 10 2 x 2...

Page 34: ...2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever mov...

Page 35: ...ls 6 apart on edges x3 x165 EAVE SIDE WALL NO DOOR PARTS REQUIRED 2 5 1 cm 9 8 Carefully flip the eave wall over Repeat STEP 7 for 4th 48 x 84 panel 3 4 1 9 cm 3 4 1 9 cm 48 121 9 cm 12 30 5 cm 6 15 2...

Page 36: ...STL TJ TJ STL 3 7 6 cm Nails 44 1 2 113 cm 44 1 2 113 cm 92 1 2 235 cm 92 1 2 235 cm 92 1 2 235 cm 68 1 2 174 cm 20 1 2 52 1 cm 1 1 2 3 8 cm x2 2 x 4 x 92 1 2 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 44 1 2...

Page 37: ...t side Use the gauge block to mark the 3 4 measurement on the wall stud Maintain 3 4 measurement along edge x48 2 5 1 cm 35 GABLE END WALL NO DOOR A 12 30 5 cm 3 1 2 8 9 cm 3 4 GAUGE BLOCK GAA 48 x 84...

Page 38: ...ss maintain flush along panel edges 48 122 cm 48 122 cm 12 30 5 cm 6 15 2 cm Flush Place 2nd 48 x 84 panel primed side up and flush with installed 48 x 84 panel edge Ensure panel is flush at top Secur...

Page 39: ...1 2 235 cm 92 1 2 235 cm 92 1 2 235 cm 68 1 2 174 cm 20 1 2 52 1 cm 1 1 2 3 8 cm x2 2 x 4 x 92 1 2 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 44 1 2 5 1 x 10 2 x 113 cm STL TOENAILING HINT For easier nailing...

Page 40: ...n right side Use the gauge block to mark the 3 4 measurement on the wall stud Maintain 3 4 measurement along edge x50 2 5 1 cm 38 GABLE END WALL NO DOOR B 12 30 5 cm 3 4 GAUGE BLOCK GAA 48 x 84 122 x...

Page 41: ...l edges 48 122 cm 23 7 8 60 6 cm 23 7 8 60 6 cm 12 30 5 cm 6 15 2 cm Flush Place 2nd 48 x 84 panel with primed side up and flush with installed 48 x 84 panel edge Ensure panel is flush at top Secure u...

Page 42: ...ls Fig A 4 3 7 6 cm x16 3 7 6 cm x2 2 5 1 cm x36 RIGHT EAVE WALL INSTALLATION 3 7 6 cm Screws OO 3 Nails into bottom plate D O O R BEGIN Stand right sidewall on floor Center right side wall assembly o...

Page 43: ...or frame Fig B ENSURE GABLE AND EAVE WALL PANELS ARE FLUSH BEFORE SECURING You have finished standing your gable end wall FINISH Secure gable wall to floor using 3 nails Fig C Nail gable wall panel to...

Page 44: ...floor dimension 1 D O O R Panel Flush EAVE WALL OPTION Nail gable wall panel to eave wall stud using 1 1 2 nails 6 apart Fig B 3 4 2 ENSURE GABLE AND EAVE WALL PANELS ARE FLUSH BEFORE SECURING 6 15 2...

Page 45: ...e Fig D 6 Secure eave wall bottom plates to floor using 3 nails Fig D Remove temporary brace 7 8 3 7 6 cm 2 5 1 cm x26 or x36 LEFT EAVE WALL INSTALLATION x12 or x16 D O O R 3 7 6 cm Nails 6 15 2 cm Na...

Page 46: ...Fig B 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Fig A 2 5 1 cm Screw Flush Flush Flush IF YOU CHOSE THE EAVE SIDE WALL FOR DOOR LOCATION USE SECOND GABLE END WALL IN PLACE OF WALL SHOWN HERE 2ND GABL...

Page 47: ...te at door opening Nail gable wall panels to eave wall studs using 1 1 2 nails 6 apart Fig E 2 5 1 cm Nails Angle nail to hit floor frame FINISH 4 3 5 6 1 1 2 3 8 cm Nails Fig F 3 7 6 cm Screw Fig E S...

Page 48: ...ter One Gusset Rafter End Rafter Align over studs MEASUREMENTS ARE TO CENTER OF RAFTER BEGIN HERE Fig A Measure to outside of rafter Measure to outside of rafter Only 1 Screw End Rafters Only 1 Screw...

Page 49: ...as shown Place middle front gable panel flush to installed left panel Ensure panels are flush Secure panel to installed UV using 1 1 2 nails Place second RL as shown under middle panel and secure usin...

Page 50: ...sh Flush Flush Flush Flush Flip over gable ladder sub assembly and attach KFB to five CLA using 3 screws Fig B Arrange measure and mark locations of five CLA as shown Place ECA on top Secure using 3 s...

Page 51: ...f ladder assembly Secure using 1 5 8 screws as shown Fig E 8 7 Orient gable and ladder assemblies as shown Fig E You will build TWO complete assemblies Fig E x2 Gable Assemblies Flush Flush Flush x2 L...

Page 52: ...g 3 screws toe screwed into UV at an angle as shown in Fig B 3 2 5 1 cm x54 5 4 Repeat STEPS 1 4 to attach gable unit to opposite wall Fig B TOP PLATE Set gable unit on top plate Secure with one 2 nai...

Page 53: ...may cause serious injury until securely fastened Note all roof panels need to be installed with the rough side up painted grid lines Attach another 40 5 8 x 48 roof panel flush with the installed pane...

Page 54: ...IRED ROOF PANELS 3 4 1 9 cm Gauge Block Fig A Secure top of each lower panel using one 2 nail into each rafter as shown Fig C Maintain spacing at 24 between the centers of the rafters 40 5 8 x 96 103...

Page 55: ...g D Secure panel with two 2 nails in the corners Attach a 48 x 96 roof panel with a 3 4 measurement on the rafter Fig A and flush with the installed panels Secure panel with two 2 nails in the corners...

Page 56: ...oof panels Repeat ALL STEPS to install roof panels on the opposite side 10 11 9 ROOF PANELS FINISH 6 15 2 cm 12 30 5 cm PARTS REQUIRED x1 48 x 47 7 8 121 9 x 121 6 cm Attach a 48 x 47 7 8 roof panel w...

Page 57: ...de down flush to front wall Fig C gable end and right soffit panel Fig D Secure using 2 finish nails Ensure soffit panels are flush at seam Fig B Fig D x4 3 8 x 7 7 8 x 86 3 4 1 x 20 x 220 3 cm x88 2...

Page 58: ...h to rafter ends Fig B and flush to gable soffit Fig A Secure using 2 finish nails two in each rafter Toenail at center seam Fig C Repeat STEPS 1 3 to attach eave side soffit panels on the opposite si...

Page 59: ...boards on the other gable end 3 You have finished installing your gable fascia FINISH 1 BEGIN Install fascia boards flush at roof panels gable peak Fig A and with primed side facing out PARTS REQUIRED...

Page 60: ...els Fig A flush to 47 7 8 fascia board and gable fascia as shown Secure using 2 finish nails into rafter ends Toenail at center seam Fig B Repeat STEPS 1 3 on opposite eave You have finished installin...

Page 61: ...ds as shown Tighten securely Attach temporary support GAA with two 1 1 4 screws as shown Tighten securely OO GAA Tighten screws securely OFFSET 4 3 7 6 cm Screws 1 1 4 3 cm Screws 3 8 1 cm 3 8 1 cm 3...

Page 62: ...3 4 3 7 6 cm Screws into door trim 3 7 6 cm Screw 3 7 6 cm x13 OO Flush against wall panels Fig A OO Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using t...

Page 63: ...tal threshold between doors and secure using eleven 3 4 special coating screws into floor as shown Fig C 9 6 Secure horizontal door rails AH with four 3 4 screws from behind to center of doors as show...

Page 64: ...ehind frame near edge before installing to seal window 3 4 1 9 cm Screws x8 You have installed your doors over door trim transom windows and threshold FINISH 3 4 1 9 cm x8 INSIDE OF DOORS x2 Transom W...

Page 65: ...ically on the right door in the door opening offset 1 2 5 cm from the edge of door Fig A 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH 3 Secure using 7 2 screws through outside trim into OO Fig...

Page 66: ...ocation of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit 3 4 1 9 cm x12 You h...

Page 67: ...DOOR Set Screw 1 1 4 Wood Screw Pre drill for screws 1 1 4 Pan Head Screw 1 1 4 Pan Head Screw Secure backplate with 1 screws and handle with 1 1 4 screws as shown x1 1 1 4 x8 3 Point Door Locking Me...

Page 68: ...ations of brackets and plates 1 1 4 Pan Head Screw Washer Washer UPPER BRACKET with offset Orient bracket as shown Washer Washer Plate 1 1 4 Pan Head Screw 1 1 4 Pan Head Screw Orient bracket as shown...

Page 69: ...67 45o DOOR HARDWARE 2 1 4 2 1 4 TOP of Door RIGHT DOOR LEFT DOOR IMPORTANT This rod to edge of door Make sure rods are straight up and down when locating brackets BOTTOM of Door...

Page 70: ...68 DOOR HARDWARE Align Plates with vertical rod points Drill thru with 3 8 drill bit to 2 depth into header and floor PLATE FRAMING PLATE FLOOR VERTICAL RODS Drill with 3 8 bit to 2 depth...

Page 71: ...sh nail at top as shown Repeat STEPS 1 2 to attach trim to all four corners Continue attaching trim flush to corners Fig B using 2 finish nails as shown You have attached your corner trim 3 2 81 7 8 2...

Page 72: ...own height using three 2 nails 1 BEGIN 2 x42 2 5 1 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x7 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x7 PARTS REQUIRED AE x6 x1 2 5 1 cm Nail Flush Flush Flush 56 142 2 cm...

Page 73: ...th 2 5 1 cm nails at each support as shown 3 FINISH You have finished installing your shelf 4 x16 x18 2 5 1 cm 7 16 x 11 7 8 x 47 7 8 1 1 x 30 2 x 121 6 cm x3 1 x 4 x 48 2 5 x 10 2 x 121 9 cm WJ x1 1...

Page 74: ...ue SP TP TP Flush Flush Flush 3 7 6 cm Nails x12 SP 2 3 4 5 Assemble joist with 3 nails in a staggered pattern Turn assembled joist over and repeat staggered nail pattern Repeat STEPS 1 3 to assemble...

Page 75: ...0 2 x 365 7 cm x2 Pre Assembled Loft Joist 7 8 9 Clamp or hold Pre Assembled Loft Joist in place flush under top plate Drill through joist and wall studs with 7 16 drill bit as shown Secure joist with...

Page 76: ...Load not to exceed 400 lbs 181 kg evenly distributed across loft FINISH You have finished installing your Loft 7 1 4 18 4 cm 2 5 1 cm Nails Flush Flush 10 Install loft panels centered over loft joist...

Page 77: ...s packaged in your Window Kit for window and trim installation Window Kit x2 From inside measure and mark locations of window framing 2x3 s included in window kit Window framing 2x3 s must be installe...

Page 78: ...h corner of window framing From outside mark straight lines connecting the holes Cut along lines using a saw Carefully trim panel opening after cutting as necessary 3 2 4 You have finished preparing y...

Page 79: ...HINT For best appearance install collar tie on rafter facing away from door opening Position and level one more collar tie WTA on 5th rafter from gable wall Attach using 2 nails as shown Attach WTA u...

Page 80: ...78 PARTS REQUIRED FINISH BEGIN 1 Locate vents in the gable walls as shown You have finished installing your vents x2 GABLE VENTS 15021 x8 8 x 1 2 5 cm Pan Head Screws 8 x 1 2 5 cm Pan Head Screws...

Page 81: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 82: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 83: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 84: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 85: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Page 86: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 87: ...rgolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergo...

Reviews: