75
Continue installing rows of
shingles by staggering at front.
Install second row of shingles flush at top of first row's rain slots. Ensure flush to drip edge at front side,
stagger each row.
Continue installing rows of shingles to the front of the shed. At the front edge of the shed make sure there is a
maximum of 5" or less to the rain slot, as shown below. If shingles overlap at front roof edge cut to roof edge with a
utility knife.
1"
(2,5 cm)
5"
(12,7 cm)
5"
(12,7 cm)
or less.
BACK OF SHED
Flush with rain slots.
Notch
Notch
Using your shingle hooked blade carefully cut shingles along chalk line.
3
5
4
6
SHINGLES
continued...
• If more than 5" to rain slot you must install another row of shingles.
BACK OF SHED
Flush with rain slots.
Top of rain slot.
Cut Off.
Cut
DOOR