20
FRONT WALL FRAME
PARTS REQUIRED:
x44
3" (7,6 cm)
Orient parts
PJ
on edge as shown.
Secure using (2) 3" nails at locations shown. Use (4) 3" nails into each side of header.
Install door header using 3" nails at locations shown.
3
4
x2
2 x 4 x 69" (5,1 x 10,2 x 175,3 cm)
PJ
Door Header
You have fi nished building your front wall frame.
FINISH
PJ
PJ
x1
4" x 69" (358,1 cm)
Pre-Assembled Door Header
(4) Nails into
Header
(4) Nails into
Header