20
PARTS REQUIRED:
FRONT WALL
x64
2" (5,1 cm)
Place left
11-7/8" x 84"
panel onto wall frame flush to top of
SZ
with primed side up as shown.
Secure panel with two 2" nails 6" (15,2 cm) apart.
Repeat Step 4 to attach the right
11-7/8" x 84"
panel.
5
4
You have finished building your front door wall.
FINISH
7
11-7/8 x 84"
(30,2 x 213,4 cm)
Maintain
Flush
Flush
Flush
Maintain
Flush
Primed
side up
Primed
side up
6"
(15,2 cm)
11-7/8"
(30,2 cm)
11-7/8"
(30,2 cm)
Go to page 29 to continue assembly.
x2