38
2" (5,1 cm)
PARTS REQUIRED (TEMPORARY)
:
3" (7,6 cm)
First, nail lower edge of panel to floor frame using 2" nails 6" apart.
Angle nail to hit floor frame
(Fig. A)
.
3
You have finished standing your RIGHT EAVE WALL.
FINISH
5
Secure side wall bottom plates to floor using 3" nails
(Fig. A)
.
4
3" (7,6 cm)
x12
x2
x25
RIGHT EAVE WALL INSTALLATION
3" (7,6 cm)
Screws
OO
3" Nails into bottom plate.
DOOR
3" (7,6 cm)
Screw
BEGIN
Stand right sidewall on floor.
Center right sidewall assembly on the 144" (365,8 cm) floor dimension.
Use
OO
as a temporary brace. Secure with two 3" screws.
2
1
14
4"
(36
5,8
cm)
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. A
DOOR
DOOR
DOOR
6"
(15,2 cm)
OO
x1
1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)