background image

16769

STOP!

STOP!

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

 1-800-844-9273

or email:

[email protected]

Our staff is ready to provide assistance

M-F 8:00 AM to 6:00 PM EST

Saturday 8:30 AM to 5:00 PM EST

Summary of Contents for BERKDALE 14' x 8'

Page 1: ...TO STORE For immediate help with assembly or product information call our toll free number 1 800 844 9273 or email customerservice yardline net Our staff is ready to provide assistance M F 8 00 AM to...

Page 2: ...This page intentionally left blank...

Page 3: ...s are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 9 C...

Page 4: ...g lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that...

Page 5: ...category they are listed in RAFTERS TRIM x3 2 x 4 x 8 3 4 5 1 x 10 2 x 22 2 cm HXC x3 2 x 4 x 8 5 1 x 10 2 x 20 3 cm COA x4 3 8 x 1 3 4 x 81 1 2 1 x 4 4 x 207 cm x4 3 8 x 1 3 4 x 83 3 8 1 x 4 4 x 21...

Page 6: ...5 8 1 5 x 6 3 x 67 6 cm AH x6 19 32 x 2 1 2 x 28 1 2 1 5 x 6 3 x 72 3 cm ROR OO x2 1 1 4 x 2 1 2 x 69 3 2 x 6 3 x 175 3 cm x2 19 32 x 2 1 2 x 9 1 5 x 6 3 x 22 8 cm EY x1 2 x 4 x 96 5 1 x 10 2 x 243 8...

Page 7: ...9 x 213 4 cm x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 3 8 x 36 x 84 1 x 121 9 x 213 4 cm x1 3 8 x 36 x 84 1 x 121 9 x 213 4 cm x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 LEFT DOOR x1 RIGHT DOOR Painted...

Page 8: ...x 236 2 cm x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm Look for Stamp TREATED 7 16 x 48 x 96 1 1 x 121 9 x 243 8 cm x2 5 8 x 48 x 96 1 5 x 121 9 x 243 8 cm x3 7 16 x 15 1 16 x 23 7 8 1 1 x 38 2 x 60 6 cm x2...

Page 9: ...ENERS HARDWARE FASTENER HARDWARE BAG x7 x3 7 2 5 1 cm 3 7 6 cm 3 4 1 9 cm 2 5 0 cm 1 1 2 3 8 cm x3 3 7 6 cm 2 5 1 cm Window Large x1 x12 1 2 5 cm x4 Decorative Hinges Transom Window Spring Bolt x2 1 2...

Page 10: ...FOR INSTALLATION OF SHINGLES DRIP EDGE AND FELT COMPLETING YOUR SHED You will need these additional materials REINFORCED WOOD FLOOR FRAME OPTIONAL FOUNDATION OR FLOOR MATERIALS ADDITIONAL MATERIALS Th...

Page 11: ...y Blocks in 1 2 4 or 8 thickness Asphalt Shingles 8 Block 4 Block Gravel Gravel Do not exceed 16 4x4 Runner Shingle Shingle Maximum between leveling material locations 48 12 2x4 Treated Lumber 2 Block...

Page 12: ...n 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at lea...

Page 13: ...ier nailing stand on frame 1 Use two 3 nails at each mark Orient parts as shown on flat surface Measure and mark BEGIN You have finished your floor frame FINISH Flush Flush Flush Flush TOENAILING 32 8...

Page 14: ...t will be approximately 193 1 2 491 5 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame...

Page 15: ...ines to nail into joists under panel Ensure your floor frame is square by installing one panel and squaring frame Install floor panels with the rough side up painted grid lines side PARTS REQUIRED x1...

Page 16: ...nels Use a chalk line or use pre painted grid lines on panel for 2 nails 6 apart on edges and 12 apart inside panels 4 FLOOR PANELS Grid lines up 6 15 2 cm 12 30 5 cm Flush Flush Flush 2 5 1 cm 5 8 x...

Page 17: ...loor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the...

Page 18: ...3 7 6 cm x32 GABLE WINDOW WALL BEGIN 1 Use two 3 nails at each mark Orient parts on edge on floor Measure and mark 89 226 1 cm 80 203 2 cm 73 185 4 cm 73 185 4 cm 16 40 6 cm 16 40 6 cm 32 1 2 82 6 cm...

Page 19: ...intain 3 4 along panel edge as shown Secure panel with 2 nails 6 apart on edges and 12 apart inside panel 2 3 4 GAUGE BLOCK GAA 12 30 4 cm 3 4 1 9 cm 3 4 1 9 cm 48 121 9 cm 6 15 2 cm 48 x 84 121 9 x 2...

Page 20: ...anel onto wall frame flush to top and left panel as shown Secure panel with 2 nails 6 apart on edges and 12 apart inside panel 3 You have finished building your gable window wall FINISH 3 4 GAUGE BLOC...

Page 21: ...cm 72 182 9 cm 48 121 9 cm 24 30 4 cm 12 TK x10 TP TM TM HINT For easier nailing stand on frame x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x10 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK TP 19 x44 3 7 6 cm BEGIN...

Page 22: ...the panel using 2 nails 6 apart on edges and 12 apart inside panel Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on...

Page 23: ...nel Place two 11 7 8 x 84 panels on frame as shown Nail using 2 nails 6 apart on edges 5 6 You have finished building your back wall FINISH x2 x2 x164 BACK WALL PARTS REQUIRED 2 5 1 cm 7 Carefully fli...

Page 24: ...32 x 2 1 2 x 9 1 5 x 6 3 x 22 8 cm EY 2 x 4 x 18 1 8 5 1 x 10 2 x 46 cm GGC 89 76 2 cm 89 76 2 cm 44 1 2 113 cm 44 1 2 113 cm 3 7 6 cm Temporary support x2 Temporary support x2 Orient parts on floor...

Page 25: ...sing 2 nails 6 15 2 cm apart along edges Secure panel to TK with 1 1 2 nails Place 48 x 84 panel with primed side up onto frame flush at top and with a 1 3 4 gap along right side Maintain 1 3 4 measur...

Page 26: ...x 84 panel flush to installed panel 3 You have finished building your gable end wall FINISH 4 Carefully flip the gable wall over 48 x 84 121 9 x 213 4 cm x1 Flush Flush 6 15 2 cm 48 121 9 cm Primed si...

Page 27: ...x 67 5 1 x 10 2 x 170 1 cm AM x1 7 16 x 3 1 2 x 67 1 1 x 10 2 x 170 1 cm OSB AM OSB AM Flush Stagger 3 nails on both sides Flush Finished header assembly AM x3 COA 45 1 2 115 6 cm 33 1 2 85 1 cm 21 1...

Page 28: ...LING Hold Seam Flush Use 3 Nails x2 2 x 4 x 84 5 1 x 10 2 x 213 3 cm TO x8 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK 168 426 7 cm 96 243 8 cm 118 1 4 300 4 cm 132 335 3 cm 156 396 2 cm 84 213 4 cm 49 3 4 12...

Page 29: ...10 2 x 22 2 cm HXC x4 2 x 4 x 22 1 2 5 1 x 10 2 x 57 1 cm AO 3 24 61 cm 24 61 cm 42 1 2 107 9 cm 42 1 2 107 9 cm 11 27 9 cm 11 27 9 cm 3 7 6 cm Nails HXC HXC AO AO AO AO 2 Measure and mark to the dime...

Page 30: ...8 x 84 1 x 121 9 x 213 4 cm Place 48 x 84 panel onto wall frame flush to top of frame as shown Use the gauge block GAA to mark the 3 4 measurement on the wall stud Secure panel with 2 nails 6 apart on...

Page 31: ...gauge block to mark the 3 4 measurement on the wall stud Secure panel with 2 nails 6 apart on edges and 12 apart on inside panel 2 3 4 GAUGE BLOCK GAA 6 15 2 cm Flush 3 4 GAUGE BLOCK 12 30 5 cm Flush...

Page 32: ...along panel edges Flush Flush 6 15 2 cm 12 30 5 cm 64 162 6 cm Flush Flush 3 7 6 cm Screws PT Temporary Support 4 5 Attach PT temporary support using two 3 screws into wall frame as shown Hold the 64...

Page 33: ...k wall FINISH 3 7 6 cm x14 3 7 6 cm x2 x33 BACK WALL OR 3 7 6 cm Nails BEGIN Stand BACK WALL on floor Center wall on the 168 426 7 cm floor dimension Use XZA as a temporary brace Secure with two 3 scr...

Page 34: ...apart Angle nail to hit floor frame Fig B You have finished standing your gable end wall FINISH Secure gable end wall to floor using 3 nails Fig C Nail gable end wall panel to back wall stud using 1 1...

Page 35: ...screw into top and bottom plate Fig A 1 Nail gable wall panel to front wall stud using 1 1 2 nails 6 apart Fig B ENSURE GABLE AND FRONT WALL PANELS ARE FLUSH BEFORE SECURING 6 15 2 cm Fig B 1 1 2 3 8...

Page 36: ...gle nail to hit floor frame Fig D 2 3 Secure front wall bottom plates to floor using 3 nails Fig D Remove temporary support PT 3 7 6 cm x12 2 5 1 cm x20 FRONT WALL 3 7 6 cm Nails You have finished sta...

Page 37: ...A from back wall and floor frame Set gable window wall on floor and secure using one 2 screw in each corner Fig A B 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Flush Flush Fig B 2 5 1 cm Screw Fig A 2 5...

Page 38: ...Fig E Secure gable wall to floor using 3 nails Fig E 2 5 1 cm Nails Angle nail to hit floor frame Fig F FINISH 4 3 5 3 7 6 cm Screw 1 1 2 3 8 cm Nails Fig E Secure gable window wall top frame 2 x 4 u...

Page 39: ...h ends touching at peak Fig A Place gusset with 1 4 offset on top of rafters Fig B Apply glue where gusset contacts rafter Fig D Nail gusset to rafters using 12 2 nails in pattern shown Fig B On TWO r...

Page 40: ...ls Fig C Secure with one 3 screw toe screwed at rafter end Fig B You have finished installing your rafters 2 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 3 8 61 9 cm 24 3 8 61 9 cm 24 61 cm PARTS REQUIRED 3...

Page 41: ...cm Nails AJ on flat GGC on flat GGC on flat Orient parts on flat surface as shown Place left front gable panel as shown and secure using 1 1 2 nails as shown 1 BEGIN 2 Place right front gable panel fl...

Page 42: ...ils 1 1 2 3 8 cm Nails XWA on flat Orient parts on flat surface as shown Place left back gable panel as shown and secure using 1 1 2 nails as shown 4 3 Place right back gable panel flush to left panel...

Page 43: ...fore nailing Nail gable panel into rafter and top plate with 2 nails 6 apart Fig A 1 BEGIN 2 5 1 cm x40 2 5 1 cm Nails Fig A TOP PLATE SZ 2 Front Gable Unit 3 7 6 cm x2 On the inside secure gable unit...

Page 44: ...ngle into top plate as shown Fig A 2 Back Gable Unit 1 BEGIN NAIL FIRST 2 5 1 cm Measure 2 9 16 down from top plate and mark at each side as shown Set gable unit on top plate Hold secure with one 2 na...

Page 45: ...7 6 cm x2 NOTE Loft and shelves are designed to be installed on the Solid Gable Wall Side PARTS REQUIRED LOFT Mark studs 3 4 down with GAA Gauge Block Figs A B C Install PT and TP with 3 nails and sc...

Page 46: ...225 4 cm PARTS REQUIRED 2 5 1 cm x5 LOFT FINISH 3 You have finished installing your loft Install loft panel with 2 nails 2 5 1 cm Nails ATTENTION LOAD NOT TO EXEED 250 lbs 113 4 kg EVENLY DISTRIBUTED...

Page 47: ...6 x 243 8 cm x4 PT 3 7 6 cm x18 PT PT 59 1 2 150 21 cm 59 1 2 150 21 cm 41 1 2 105 4 cm 41 1 2 105 4 cm PARTS REQUIRED 2 Install both PT s using 3 screws as shown Install both PT s using 3 screws as...

Page 48: ...46 x2 7 16 x 10 1 2 x 88 3 4 1 1 x 26 7 x 225 4 cm SHELVES FINISH You have finished installing your shelves PARTS REQUIRED Install shelves using 2 nails as shown 2 5 cm x20 3...

Page 49: ...er the rafter Fig B Secure panel with two 2 5 1 cm nails ias shown Panel will overhang Fig D 3 2 Install 15 1 16 x 96 and 15 1 16 x 23 7 8 roof panels flush with the chalk line Secure each panel with...

Page 50: ...auge block GAA to center panel on the rafter Fig J Secure panel with two 2 5 1 cm nails in the bottom corners 47 7 8 X 48 121 6 x 121 9 cm Two Nails 3 4 1 9 cm Gauge Block Fig J Panel 1 2 12 7 mm Raft...

Page 51: ...er the rafter Fig L Secure panel with two 2 5 1 cm nails in the bottom corners Install 23 7 8 x 48 roof panel Fig K There will be a 1 2 reveal on the edge of the rafter Fig M Secure panel with two 2 5...

Page 52: ...PS 1 9 to install roof panels on opposite side FINISH 10 12 30 5 cm 6 15 2 cm Keep spacing between the center of the rafters at the upper edge of the panels Secure panels with one 2 nail into each raf...

Page 53: ...x 160 8 cm XZA XZA XZA 1 1 2 3 8 cm Nails Flush Flush Flush Angled End Angled Ends BEGIN 1 Secure with 1 1 2 nails spaced evenly Orient parts on floor Line up 3 8 x 3 7 8 x 63 5 16 trim primed side d...

Page 54: ...gable trim unit x16 Flush Fig B You have finished installing your gable trim units FINISH BEGIN 1 Secure with four 3 screws into end rafter and spaced evenly Repeat STEP 1 for opposite side Install LE...

Page 55: ...8 x 63 5 16 1 x 9 8 x 160 8 cm x2 3 8 x 3 7 8 x 63 5 16 1 x 9 8 x 160 8 cm You have finished installing your gable fascia FINISH BEGIN 1 Secure with 2 finish nails into gable unit spaced evenly Repea...

Page 56: ...talling your eave soffits FINISH Install CRA s under roof panel tight against wall panels and inner gable trim as shown Fig A B Use 1 1 4 screws through roof sheeting into CRA CRA CRA CRA CRA CRA CRA...

Page 57: ...ing your eave side fascia FINISH PARTS REQUIRED Primed Side Out 2 5 1 cm Finish Nails 2 5 1 cm Finish Nails Flush with roof panel Fig A Flush x2 3 8 x 3 7 8 x 78 1 x 9 8 x 198 1 cm x2 3 8 x 3 7 8 x 96...

Page 58: ...Left Door Right Door BEGIN 1 DOORS 2 3 Attach temporary support OO with 3 screws in middle and at ends as shown Attach temporary support GAA with two 2 screws as shown OO GAA OFFSET 4 3 7 6 cm Screws...

Page 59: ...orts and check doors open properly FINISH You have finished installing your double doors Screw hinge boards into wall supports using 10 3 screws as shown 5 PANEL SEAM 3 8 1 cm Attach temporary support...

Page 60: ...oor trim FINISH BEGIN 1 Secure door trim from inside using 3 4 screws as shown Fig A 2 Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown Fig B Use two...

Page 61: ...flush with the edge of door Fig A 1 PARTS REQUIRED x12 2 5 1 cm DOOR STIFFENERS FINISH Repeat Step 1 to install OO on right door 2 Secure using 6 2 screws through outside trim into OO Fig B Fig A Cent...

Page 62: ...s BEGIN 1 Set Screw 1 1 2 3 8 cm x2 1 3 4 4 4 cm 35 3 4 90 8 cm INSTALL ON RIGHT DOOR TOP VIEW 1 4 0 6 cm Pre drill and 1 2 1 2 cm Drill through 1 4 0 6 cm 1 2 1 3 cm Drill Bits You have finished inst...

Page 63: ...for screws Install bolt with screws supplied and drill 5 16 0 8 cm hole deep enough for bolt to slide into LEFT DOOR 5 16 0 8 cm Drill Bit PARTS REQUIRED DOOR HARDWARE HINT With door closed extend bol...

Page 64: ...RATIVE HINGES x12 1 2 5 cm x4 FINISH PARTS REQUIRED BEGIN 1 You have finished installing your decorative door hinges Level decorative hinges in position as shown Secure with 1 2 5 cm screws 1 2 5 cm S...

Page 65: ...eave wall Fig A B using one 2 finish nail at top as shown Repeat STEPS 1 2 to attach trim to all four corners Finish attaching trim flush to corners Fig B using 6 2 5 1 cm finish nails as shown You ha...

Page 66: ...LLAR TIES FINISH You have finished installing your collar ties 2 1 BEGIN Position and level collar ties GUA on 3rd and 5th rafters from gable end wall Attach with 2 nails as shown x12 2 5 1 cm GUA 3rd...

Page 67: ...k behind frame near edge Fig A BEGIN 1 3 Attach window using four 2 5 1 cm screws as shown Ensure window is level and centered Seal window with high quality exterior grade caulk before installing Fig...

Page 68: ...You have finished installing your windows and window trim Repeat Steps 4 to install trim for second and third windows WINDOW TRIM 5 Place trim pieces ROR and AZ centered on window frame Fig A Attach u...

Page 69: ...ttach window using 6 3 4 screws as shown Fig A 3 4 1 9 cm Screws HINT Caulk behind frame near edge before installing Fig A Seal window behind flange edges with high quality exterior grade caulk before...

Page 70: ...ark Center Do not nail into window flange YR Center YR over transom window and secure using four 2 finish nails into framing as shown Fig A x1 19 32 x 2 1 2 x 32 3 4 1 5 x 6 3 x 83 1 cm YR 2 Finish Na...

Page 71: ...shown Fig B x2 19 32 x 2 1 2 x 9 1 5 x 6 3 x 22 8 cm EY Install 2 EY trim pieces using 2 finish nails into trim and panels as shown Fig B Do not nail into window flange Flush Flush Flush Flush YR 2 F...

Page 72: ...TRIM ZJ Center ZJ on top of vertical trim Fig A ZJ x1 19 32 x 2 1 2 x 72 3 2 x 6 3 x 182 9 cm Flush BEGIN 1 Secure using 2 finish nails into framing as shown 2 5 1 cm Finish Nails FINISH You have fin...

Page 73: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 74: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 75: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 76: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 77: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Page 78: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 79: ...This page intentionally left blank...

Page 80: ...dges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces...

Reviews: