ON/OFF
Unload air-in grille
Take off air-in grille
Installation bolt hole
INSTALLATION OF PANEL
1.Please screw M10 gasket and M6*20
bolt at the corner of indoor unit ,before
screwing them fasten ,screw other two
additional bolts which locates red bolt
showing as figure and notice that the
direction of red arrow on the electrical
box aligns the one on the panel.
2.Please connect step motor wire,display
board wire to the electrical box according
to ELECTRIC WIRING DIAGRAM on the
electrical box.
3.Then screw the other two M6*20 bolt with
M10 gasket through the hole of panel into
outdoor unit.
4.Adjust the location and direction of panel
to tally louver of panel with outlet of
outdoor,screw all the bolts fasten to
make the panel and outdoor unit
pressed together.
5.Return the air-in grille and panel back
to the outdoor unit.
.
BODY DIMENSION:580X255X580
Cut the refrigerant pipr off with pipe cutter.
Aim at connection pipe
fix the nut of connection pipe, then tighten]
as the following diagram with spanner
FlARING
1
Flaring after putting the pipe into connection nut.
2
Flare
90
slant roughess
According to installation conditions, overlarge wrenched
torch will destroy the nut. (Unit. N.cm)
Notice
Stop valve operation item
Open the valve rod til to the position rod.
Do not trey to open larger.
Fasten the bonnet with spanner or similar tools.
Fasten the bonnet of valve rod.
Liquid side( 3/8 , 1/2 ) 1180N.cm(120kgf.cm)
gas side( 5/8 , 3/4 ) 1180N.cm(120kgf.cm)
″
″
″
″
:
:
Connection pipe nut
Position limitation rob
Bonnet
Valve body
Valve pole
Junction fixture
Outside
diameter
1/4
″
1/2
″
3/8
″
5/8
″
3/4
″
1420~1720N cm
(144~176kgf cm)
.
9720~11860N cm
(990~1210kgf cm)
.
6180~7540N cm
(630~770kgf cm)
.
4950~6030N cm
(504~616kgf cm)
.
3270~3990N cm
(333~407kgf cm)
.
Outside
A mm
(
)
MAX MIN
3/8
″
12.4 12.0
1/4
″
8.7
8.3
1/2
″
15.8 15.4
5/8
″
19.0 18.6
3/4
″
23.3 22.9
When vacuum pump is used, each low-pressure valve muse be manipulated as follow
Burr
Pipe
Diameter
Please refer to operation manual for the usage of manifold valve.
Stengthen to
fasten the torch
High pressure valve
Low presasure valve
Manifold valve
Multi-function gauge
pressure gauge
-76cmHg
Lohandle
Discharged hose
Discharged hose
Vacuum pump
Hihandle
1.Connect the recharged hose to lower pressure valve jucntion ( low/high pressure valve must be
tightened.)
2.Connect the charged hose junction with vacuum pump.
3.Open the low pressure handler of manifold fully.
4.Start vacuumizing with vacuum pump. Wjhen vacuumizing begins,loosen the nut of low pressure
valve a bit. Check is the air enters(noise of vacuum pump changes, the all-purpose meter indication
changefrom negative to zero), then tighten the nut of connection pipe.
5.After vacuumizing finishing, tighten thelow pressure
handler of manifoldvalve fully and stops the vacuum pump.
When vacuumizing is carried out for over 15 minutes,
please confirm if the all-purpose meter points at -1.0X10
5
Pa(-76cmHg)
。
6.Open the high/low pressure valve fully.
7.Dismantle the recharged hose from charge gap of low
pressure valve.
8.Tighten the bonnet of low-pressure valve.
14