Baffle
Steel bar
1.Please use 4 pieces of 6mm steel wire hanging the outdoor unit up and
move in.
2. To avoid the outdoor unit is out of shpe, please add the baffles at the
surface of outdoor unit where the steel wire rope may touch.
3.after moving, please remove the tray wood on the bottom.
At least 600mm space must be left between outdoor units as the sketch indicated.
4 pieces for one unit
600mm
Bolt
Liquid side
High-presure
valve
Low-pressure
valve
Gas side
1. The junction is inside the cover of the right panel, please take
off the cover first.
2. The pipe gets out of the side gap of the cover.
3. After connecting from the valve gap, reinstall it from left, right or
b
ackwards for installation.
4.The right picture is the sketch map of valve installation
board of outdoor. Gas-side(low pressure)is the
one upward, liquid side is the one downward.
INSTALLATION SPACE
After leaving repair space as illustrated below, install the outdoor unit with power supply equipmentinstalled at the
side of the outdoor unit. Please refer to ELECTRIC SUPPLY INSTALLATION MANUAL for the installation method.
Please make sure necessary space for installation and repair.
1.
2.
!!
Air outlet of the outdoor unit
Overview of the outdoor unit
No obstruction from the air outlet of outdoor unit
Above
Above
Above
Above
Air
Air inlet
linlet
Air outlet
Refrigerant pipe
OUTDOOR UNIT INSTALLATION
Move outdoor unit in
INSTALLATION
.
.
Pre-installation precautions
Please confirm that the installation personnel are qualified in relevant installation service. If the air
conditioner was installed by persons without special skills, normal operations would not be ensured, even
the personal and estate safety would be affected.
The air conditioner should be installed securely; otherwise poor installation may lead to abnormal noises and
vibration.
Outdoor unit should be installed at a spot ensuring that its air outlet noises and hot exhaust will not violate your
neighbors.
The user's installation site should be provided with regular power supply in conformity with that indicated in
nameplate of the air conditioner, and its voltage should be within a range 90 %
110 % of the rated voltage
value.
Power circuit should be equipped with protector, such as electricity leakage protector or air switch, which
should possess a capacity greater than 1.5 times the maximum current value of the air conditioner.
Never fail to adopt personal circuit and effectively-grounded socket compatible with the attached plug of the
air conditioner. The attached plug is equipped with grounding pin, and it must not be modified as desired.
Please adopt the fuse or circuit breaker prescribed in Installation Instructions.
Only qualified electrician is allowed to carry out wiring tasks strictly according to electric safety requirements.
Do ensure good earth of air conditioner, in other words, the main power switch of air conditioner must be
connected to reliable ground wire.
.
.
.
..
.
please refer to the following for the center distance between the bolts
M 10 whorl is used
please consult professional for your specific ceiling arrangement.
1
.
2
.
3
.
Installation of the hanging screw bolt
After the main body hanging is finished, arrangement of pipe and line will be done in the ceiling.
The direction of the pipe is determined after the installation location is chosen.If the ceiling has existed,
please arrange the refrigerant pipe, drainage pipe, indoor and outdoor connecting line.
Please confirm the indoor unit dimension according to the picture below
M10 whorl is to be installed.(4 sets)
Dismantle scale of the ceiling......please keep ceiling its level. Strengthen the beam to avoid vibration.
Break the beam of the ceiling
Strengthen the breaking point of the ceiling and reinforce the ceiling beam.
User guideline
Precautions
Unit body installation
17