2 - 23
SPEC
„
Pass the neutral switch lead and
CDI magneto lead through the
cable guide and over the middle
radiator mounting boss. Then, pass
the decompression cable under the
middle radiator mounting boss and
along the left side of the neutral
switch lead and CDI magneto lead.
Ù
Fit the brake hose into the guides
on the protector.
Á
Fasten the ignition coil lead (in the
sub wire harness) on the upper
inside of the frame and cut off the
tie end.
Û
Pass the ignition coil lead (in the
sub wire harness) under the cush-
ion bracket (frame).
Fasten the ignition coil lead (in the
sub wire harness) to the frame
and cut off the tie end.
Pass the carburetor breather
hoses and overflow hose so that
all there hoses do not contact the
rear shock absorber.
A A
A B
CABLE ROUTING DIAGRAM
Summary of Contents for YZ426F
Page 47: ...GEN INFO MEMO ...
Page 69: ...GEN INFO MEMO ...
Page 193: ...INSP ADJ MEMO ...
Page 577: ... ELEC MEMO ...
Page 605: ...TUN MEMO ...
Page 632: ......