5-51
SWINGARM
INSTALLING THE BEARING AND OIL SEAL
1. Install:
• Bearing "1"
• Oil seal "2"
To swingarm.
• Apply the molybdenum disulfide grease on
the bearing when installing.
• Install the bearing by pressing it on the side
having the manufacture's marks or numbers.
• First install the outer and then the inner bear-
ings to a specified depth from inside.
2. Install:
• Bearing "1"
• Washer "2"
• Oil seal "3"
To relay arm.
• Apply the molybdenum disulfide grease on
the bearing when installing.
• Install the bearing by pressing it on the side
having the manufacture's marks or numbers.
• Apply the molybdenum disulfide grease on
the washer.
3. Install:
• Bearing "1"
• Oil seal "2"
To connecting rod.
• Apply the molybdenum disulfide grease on
the bearing when installing.
• Install the bearing by pressing it on the side
having the manufacture's marks or numbers.
Installed depth of bearings:
Outer "a": Zero mm (Zero in)
Inner "b": 6.5 mm (0.26 in)
Installed depth of bearings "a":
Zero mm (Zero in)
Installed depth of bearings "a":
Zero mm (Zero in)
Summary of Contents for YZ125 2009
Page 6: ...YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY ...
Page 45: ...MEMO ...
Page 46: ...2 15 CABLE ROUTING DIAGRAM CABLE ROUTING DIAGRAM ...
Page 48: ...2 17 CABLE ROUTING DIAGRAM ...
Page 50: ...2 19 CABLE ROUTING DIAGRAM ...
Page 52: ...2 21 CABLE ROUTING DIAGRAM ...
Page 80: ...3 27 CHASSIS ...
Page 233: ......