5-53
SWINGARM
6. Install:
• Swingarm "1"
• Pivot shaft "2"
• Apply the molybdenum disulfide grease on
the pivot shaft.
• Insert the pivot shaft from right side.
7. Check:
• Swingarm side play "a"
Free play exists
→
Replace thrust bearing.
• Swingarm up and down movement "b"
Unsmooth movement/binding/rough spots
→
Grease or replace bearings, bushings
and collars.
8. Install:
• Bolt (connecting rod) "1"
• Washer "2"
• Nut (connecting rod) "3"
• Apply the molybdenum disulfide grease on
the bolt.
• Do not tighten the nut yet.
9. Install:
• Bolt (rear shock absorber-relay arm) "1"
• Nut (rear shock absorber-relay arm) "2"
Apply the molybdenum disulfide grease on the
bolt.
10.Tighten:
• Nut (connecting rod) "1"
Pivot shaft:
85 Nm (8.5 m•kg, 61 ft•lb)
Nut (rear shock absorber-relay
arm):
53 Nm (5.3 m•kg, 38 ft•lb)
Nut (connecting rod):
80 Nm (8.0 m•kg, 58 ft•lb)
Summary of Contents for YZ125 2009
Page 6: ...YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY ...
Page 45: ...MEMO ...
Page 46: ...2 15 CABLE ROUTING DIAGRAM CABLE ROUTING DIAGRAM ...
Page 48: ...2 17 CABLE ROUTING DIAGRAM ...
Page 50: ...2 19 CABLE ROUTING DIAGRAM ...
Page 52: ...2 21 CABLE ROUTING DIAGRAM ...
Page 80: ...3 27 CHASSIS ...
Page 233: ......