4-53
ENGINE REMOVAL
HANDLING NOTE
Support the machine securely so there is no
danger of it falling over.
REMOVING THE DRIVE SPROCKET
1. Remove:
• Nut (drive sprocket) "1"
• Lock washer "2"
• Straighten the lock washer tab.
• Loosen the nut while applying the rear brake.
2. Remove:
• Drive sprocket "1"
• Drive chain "2"
Remove the drive sprocket together with the
drive chain.
REMOVING THE ENGINE
1. Remove:
• Pivot shaft "1"
If the pivot shaft is pulled all the way out, the
swingarm will come loose. If possible, insert a
shaft of similar diameter into the other side of
the swingarm to support it.
2. Remove:
• Engine "1"
From right side.
Make sure that the couplers, hoses and cables
are disconnected.
INSTALLING THE ENGINE
1. Install:
• Engine "1"
Install the engine from right side.
• Pivot shaft "2"
• Engine mounting bolt (lower) "3"
• Engine mounting bolt (front) "4"
• Engine bracket "5"
• Bolt (engine bracket) "6"
• Engine mounting bolt (upper) "7"
Apply the molybdenum disulfide grease on the
pivot shaft.
Pivot shaft:
85 Nm (8.5 m•kg, 61 ft•lb)
Engine mounting bolt (lower):
64Nm (6.4 m•kg, 46 ft•lb)
Engine mounting bolt (front):
64 Nm (6.4 m•kg, 46 ft•lb)
Bolt (engine bracket):
34 Nm (3.4 m•kg, 24 ft•lb)
Engine mounting bolt (upper):
34 Nm (3.4 m•kg, 24 ft•lb)
Summary of Contents for YZ125 2009
Page 6: ...YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY ...
Page 45: ...MEMO ...
Page 46: ...2 15 CABLE ROUTING DIAGRAM CABLE ROUTING DIAGRAM ...
Page 48: ...2 17 CABLE ROUTING DIAGRAM ...
Page 50: ...2 19 CABLE ROUTING DIAGRAM ...
Page 52: ...2 21 CABLE ROUTING DIAGRAM ...
Page 80: ...3 27 CHASSIS ...
Page 233: ......