5-4
Order
Job / Part
Q’ty
Remarks
1
2
3
4
5
6
7
Removing the engine
Bolt (front upper)
Bolt (front under)
Bolt (rear upper)
Bolt (rear under)
Engine stay (front upper)
Engine stay (front under)
Engine stay (rear upper)
2
1
1
1
1
1
2
Remove the parts in the order listed.
Place a suitable stand under the frame and
engine.
Refer to “INSTALLING THE ENGINE”.
For installation, reverse the removal
procedure.
NOTE:
35 Nm (3.5 m
kg)
35 Nm (3.5 m
kg)
35 Nm (3.5 m
kg)
35 Nm (3.5 m
kg)
35 Nm (3.5 m
kg)
ENGINE REMOVAL
ENG
EAS00191
ENGINE
Summary of Contents for XVS250 2001
Page 1: ......
Page 2: ......
Page 8: ......
Page 9: ......
Page 11: ...GEN INFO ...
Page 19: ......
Page 20: ......
Page 22: ...SPEC ...
Page 45: ...2 23 ENGINE OIL FLOW DIAGRAMS SPEC EB205000 ENGINE OIL FLOW DIAGRAMS ...
Page 46: ...2 24 ENGINE OIL FLOW DIAGRAMS SPEC ...
Page 47: ...2 25 ENGINE OIL FLOW DIAGRAMS SPEC ...
Page 56: ......
Page 57: ......
Page 108: ......
Page 178: ......
Page 179: ......
Page 250: ......
Page 252: ...CARB ...
Page 267: ...6 15 A From air cleaner B To reed valve AIR INDUCTION SYSTEM CARB EAS00508 ...
Page 274: ......
Page 275: ......
Page 277: ...ELEC ...
Page 308: ...7 31 SIGNALING SYSTEM ELEC SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 321: ......
Page 322: ......
Page 324: ...TRBL SHTG ...
Page 330: ......