5-47
CLUTCH
ENG
80 Nm (8.0 m
kg)
NOTE:
NOTE:
75 Nm (7.5 m
kg)
NOTE:
INSTALLING THE PRIMARY DRIVE GEAR
1. Install:
straight key
primary drive gear
1
thrust washer
lock washer
2
primary drive gear nut
3
While holding the generator rotor with the
sheave holder, tighten the primary drive gear
nut.
Sheave holder
90890-01701
EAS00298
INSTALLING THE CLUTCH
1. Install:
clutch housing
1
thrust washer
2
clutch boss
3
lock washer
clutch boss nut
Make sure that the teeth on the lock washer are
correctly aligned with the grooves on the clutch
boss.
2. Tighten:
clutch boss nut
1
While holding the clutch boss with the universal
clutch holder, tighten the clutch boss nut.
Universal clutch holder
90890-04086
3. Bend the lock washer tab along a flat side of
the nut.
4. Lubricate:
friction plates
clutch plates
(with the recommended lubricant)
Recommended lubricant
Engine oil
Summary of Contents for XVS250 2001
Page 1: ......
Page 2: ......
Page 8: ......
Page 9: ......
Page 11: ...GEN INFO ...
Page 19: ......
Page 20: ......
Page 22: ...SPEC ...
Page 45: ...2 23 ENGINE OIL FLOW DIAGRAMS SPEC EB205000 ENGINE OIL FLOW DIAGRAMS ...
Page 46: ...2 24 ENGINE OIL FLOW DIAGRAMS SPEC ...
Page 47: ...2 25 ENGINE OIL FLOW DIAGRAMS SPEC ...
Page 56: ......
Page 57: ......
Page 108: ......
Page 178: ......
Page 179: ......
Page 250: ......
Page 252: ...CARB ...
Page 267: ...6 15 A From air cleaner B To reed valve AIR INDUCTION SYSTEM CARB EAS00508 ...
Page 274: ......
Page 275: ......
Page 277: ...ELEC ...
Page 308: ...7 31 SIGNALING SYSTEM ELEC SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 321: ......
Page 322: ......
Page 324: ...TRBL SHTG ...
Page 330: ......