4-6
ENG
ENGINE
NOTE:
EAS00192
INSTALLING THE ENGINE
1. Tighten the bolts in the following order.
Bolt
1
:
88 Nm (8.8 m
kg)
Bolt
2
:
48 Nm (4.8 m
kg)
Bolt
3
:
55 Nm (5.5 m
kg)
Bolt
4
:
30 Nm (3.0 m
kg)
Bolt
5
:
64 Nm (6.4 m
kg)
Nut
6
:
64 Nm (6.4 m
kg)
2. Install:
shift arm
1
Align the punch mark
b
in the shift shaft with
the punched mark
a
on the shift arm.
Align the bottom edge of the shift pedal with
the mark on the frame-to-swingarm bracket.
Shift arm bolt
10 Nm (1.0 m
kg)
Summary of Contents for XJR1300 (L) '99
Page 1: ......
Page 2: ......
Page 8: ......
Page 10: ...GEN INFO ...
Page 18: ...GEN INFO ...
Page 20: ...SPEC ...
Page 32: ...2 12 SPEC MAINTENANCE SPECIFICATIONS Tightening sequence Cylinder head Crankcase ...
Page 45: ...2 25 1 Camshaft 2 Crankshaft 3 Oil pump 4 Oil filter SPEC LUBRICATION DIAGRAMS ...
Page 56: ...SPEC ...
Page 108: ...CHK ADJ ...
Page 112: ...ENG ...
Page 202: ...CARB ...
Page 282: ...CHAS ...
Page 284: ...ELEC ...
Page 330: ...TRBL SHTG ...
Page 336: ...TRBL SHTG ...