2-29
E Fasten the high tension cables
(#1, 2) with a plastic clamp. Posi-
tion the clamp at 50 – 80 mm
above the high tension cable
number.
F Fasten the horn lead to the frame
with a plastic band. Make sure
that the end of band down ward.
G Install the frame ground and ig-
niter unit together with screw.
A Insert the plastic band through
the hole of plastic panel and then
fasten the clutch hose with it.
Make sure that the end of band
inside of motorcycle.
B To headlight lower hole.
C Route the wireharness and start-
er cable through the guide.
D Connect the ignition lead with
white marking tape to the ignition
coil (#1, 4).
1
Clutch hose
2
Starter cable
3
Air filter case drain hose
4 Frame ground
5
Flasher relay connector
6
Oil light relay connector
7
Igniter unit connectors
8
Starter motor
9
AC generator
10
Sidestand switch
11
Sidestand switch lead
12
Ignition coil lead (#1, 4)
SPEC
CABLE ROUTING
Summary of Contents for XJR1300 (L) '99
Page 1: ......
Page 2: ......
Page 8: ......
Page 10: ...GEN INFO ...
Page 18: ...GEN INFO ...
Page 20: ...SPEC ...
Page 32: ...2 12 SPEC MAINTENANCE SPECIFICATIONS Tightening sequence Cylinder head Crankcase ...
Page 45: ...2 25 1 Camshaft 2 Crankshaft 3 Oil pump 4 Oil filter SPEC LUBRICATION DIAGRAMS ...
Page 56: ...SPEC ...
Page 108: ...CHK ADJ ...
Page 112: ...ENG ...
Page 202: ...CARB ...
Page 282: ...CHAS ...
Page 284: ...ELEC ...
Page 330: ...TRBL SHTG ...
Page 336: ...TRBL SHTG ...