ENGINE
3-7
1. Stand the vehicle on a level surface.
NOTE:
Place the vehicle on the center stand.
2. Remove:
●
FUEL TANK
Refer to “FUEL TANK” on page 6-1.
●
Vacuum hose “1”
3. Install:
●
Vacuum gauge “1”
(to vacuum hose in illustration)
●
Digital tachometer
(to high tension cord)
4. Install the fuel tank.
NOTE:
Do not install the bolt at the rear of the fuel tank.
5. Start the engine and let it warm up for several
minutes.
6. Check:
●
Standard idling speed
Refer to “CHECKING THE ENGINE IDLING
SPEED” on page 3-9.
7. Adjust:
●
SYNCHRONIZING THE THROTTLE BOD-
IES
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Take throttle body #3 as standard, and turn
adjusting screw “1” so that throttle bodies #1
and #2 are adjusted to the same value.
NOTE:
●
After each step, rev the engine two or three
times, each time for less than a second, and
check the throttle bodies.
●
When the adjusting screw has been removed,
turn the screw is fully, and then turn it out 3/4
turn.
Then,syncronize the throttle bodies.
CAUTION:
ECA14900
Do not use the throttle valve adjusting
screws to adjust the throttle body syncroni-
zation.
NOTE:
The pressure difference between 2 throttle bod-
ies should not exceed 1.3 kPa(10 mmHg).
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
8. Check:
●
Standard idling speed
Pressure difference should be within the
specified range.
9. Stop the engine and remove the fuel tank and
measuring equipment.
10.Adjust:
●
Throttle cable free play
Vacuum gauge
90890-03094
Carburetor synchronizer
YU-44456
Digital tachometer
90890-06760
YU-39951-B
1
1
1
Engine idling speed
970
–
1170 r/min
Intake vacuum
32.5 kPa (9.6 inHg) (244 mmHg)
1
1
Summary of Contents for XJR1300 2007
Page 1: ...SERVICE MANUAL XJR1300 W 5WM 28197 E0 2007 ...
Page 2: ......
Page 8: ......
Page 47: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 24 ...
Page 48: ...LUBRICATION DIAGRAMS 2 25 EAS28860 LUBRICATION DIAGRAMS ...
Page 50: ...LUBRICATION DIAGRAMS 2 27 ...
Page 51: ...LUBRICATION DIAGRAMS 2 28 1 Drive axle 2 Push rod 3 Main axle 4 Camshaft 5 Crankshaft ...
Page 52: ...LUBRICATION DIAGRAMS 2 29 ...
Page 53: ...LUBRICATION DIAGRAMS 2 30 1 Nozzle 2 Bypass valve 3 Oil filter element 4 Relief valve ...
Page 54: ...CABLE ROUTING 2 31 EAS20430 CABLE ROUTING ...
Page 56: ...CABLE ROUTING 2 33 ...
Page 58: ...CABLE ROUTING 2 35 ...
Page 60: ...CABLE ROUTING 2 37 ...
Page 62: ...CABLE ROUTING 2 39 ...
Page 64: ...CABLE ROUTING 2 41 ...
Page 66: ...CABLE ROUTING 2 43 ...
Page 68: ...CABLE ROUTING 2 45 ...
Page 70: ...CABLE ROUTING 2 47 ...
Page 205: ...GENERATOR 5 32 b Measure the stator coil resistances 1 2 ...
Page 240: ...STARTER CLUTCH 5 67 1 3 2 New ...
Page 260: ...FUEL TANK 6 3 fuel hose end in the direction of the arrow 1 ...
Page 269: ...THROTTLE BODIES 6 12 ...
Page 270: ...AIR INDUCTION SYSTEM 6 13 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 4 5 4 4 3 2 1 1 2 4 3 ...
Page 274: ...AIR INDUCTION SYSTEM 6 17 ...
Page 277: ......
Page 278: ...IGNITION SYSTEM 7 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Page 282: ...ELECTRIC STARTING SYSTEM 7 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Page 288: ...CHARGING SYSTEM 7 11 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Page 289: ...CHARGING SYSTEM 7 12 1 Generator 2 Main switch 4 Main fuse 7 Battery ...
Page 291: ...CHARGING SYSTEM 7 14 ...
Page 292: ...LIGHTING SYSTEM 7 15 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Page 295: ...LIGHTING SYSTEM 7 18 ...
Page 296: ...SIGNALING SYSTEM 7 19 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Page 302: ...FUEL INJECTION SYSTEM 7 25 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Page 342: ...FUEL PUMP SYSTEM 7 65 EAS27580 FUEL PUMP SYSTEM EAS27590 CIRCUIT DIAGRAM ...
Page 345: ...FUEL PUMP SYSTEM 7 68 ...
Page 346: ...IMMOBILIZER SYSTEM 7 69 EAS27640 IMMOBILIZER SYSTEM EAS27650 CIRCUIT DIAGRAM ...
Page 355: ...IMMOBILIZER SYSTEM 7 78 ...
Page 361: ...ELECTRICAL COMPONENTS 7 84 a b Br R Br R ...
Page 382: ......
Page 383: ......
Page 384: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...