HANDLEBAR
4-44
6. Install:
• Clutch lever
• Clutch switch “1”
TIP
Align the projection “a” on the clutch switch with
the slit “b” in the clutch lever holder.
7. Connect:
• Clutch cable
TIP
Lubricate the end of the clutch cable with a thin
coat of lithium-soap-based grease.
8. Install:
• Handlebar grip
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Apply a thin coat of rubber adhesive onto the
left end of the handlebar.
b. Slide the handlebar grip over the left end of
the handlebar and install the grip so that the
arrow mark “L” on the grip faces up and is
within the angle shown in the illustration.
c. Wipe off any excess rubber adhesive with a
clean rag.
WARNING
EWA13700
Do not touch the handlebar grip until the rub-
ber adhesive has fully dried.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
9. Install:
• Left handlebar switch “1”
TIP
Align the projection “a” on the left handlebar
switch with the hole “b” in the handlebar.
10.Install:
• Throttle grip “1”
• Throttle cable “2”
• Right handlebar switch “3”
TIP
• Be sure to position the washer between the
throttle grip and the right handlebar switch.
• Lubricate the end of the throttle cable and the
inside of the throttle grip with a thin coat of lith-
ium-soap-based grease, and then install the
throttle grip onto the handlebar.
• Route the throttle cable through the slot in the
throttle grip, and then install the cable.
• Align the projection “a” on the right handlebar
switch with the hole “b” on the handlebar.
1
a
a
1
b
23˚±5˚
a
b
1
1
2
3
a
b
Summary of Contents for WR125R 2009
Page 1: ...2009 SERVICE MANUAL WR125R WR125X 22B F8197 E0 ...
Page 6: ......
Page 8: ......
Page 24: ...SPECIAL TOOLS 1 15 ...
Page 51: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 26 ...
Page 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 EAS20410 LUBRICATION DIAGRAMS A 1 4 5 6 7 2 3 ...
Page 56: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 1 3 2 4 ...
Page 57: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 32 1 Camshaft 2 Crankshaft 3 Main axle 4 Drive axle ...
Page 58: ...COOLING SYSTEM DIAGRAMS 2 33 EAS20420 COOLING SYSTEM DIAGRAMS 9 1 2 6 7 8 3 5 4 ...
Page 66: ...CABLE ROUTING 2 41 A A B B C C A A B B A B C E D 1 2 3 4 5 6 7 8 9 12 10 11 14 13 ...
Page 68: ...CABLE ROUTING 2 43 B B C C A A A B B C C A A B C C 1 2 3 4 3 4 5 6 7 8 9 10 11 ...
Page 78: ...CABLE ROUTING 2 53 ...
Page 81: ......
Page 109: ...ELECTRICAL SYSTEM 3 28 1 a b ...
Page 110: ...ELECTRICAL SYSTEM 3 29 ...
Page 113: ......
Page 142: ...FRONT BRAKE 4 29 Refer to BLEEDING THE HYDRAULIC BRAKE SYSTEM on page 3 19 ...
Page 184: ...CHAIN DRIVE 4 71 ...
Page 248: ...CRANKCASE 5 61 A Left crankcase B Right crankcase A 1 7 11 12 3 14 2 13 4 5 6 8 9 10 16 15 B ...
Page 258: ...TRANSMISSION 5 71 ...
Page 277: ...THROTTLE BODY 7 8 ...
Page 278: ...AIR INDUCTION SYSTEM 7 9 EAS27040 AIR INDUCTION SYSTEM 2 1 3 ...
Page 282: ...AIR INDUCTION SYSTEM 7 13 ...
Page 285: ......
Page 295: ...ELECTRIC STARTING SYSTEM 8 10 ...
Page 297: ...CHARGING SYSTEM 8 12 2 AC magneto 4 Rectifier regulator 5 Main fuse 6 Battery ...
Page 299: ...CHARGING SYSTEM 8 14 ...
Page 313: ...COOLING SYSTEM 8 28 ...
Page 343: ...FUEL PUMP SYSTEM 8 58 ...
Page 369: ......
Page 370: ......