
4 - 65
ENG
7. Install:
●
Crankcase cover (left)
8. Connect:
●
Neutral switch lead
1
NOTE:
Pass the neutral switch lead into the crank-
case cover groove as shown.
9. Connect:
●
CDI magneto lead
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
CDI MAGNETO AND STARTER CLUTCH
(TT-R125E/TT-R125LWE)
Summary of Contents for TT-R125E(W)
Page 2: ......
Page 14: ...MEMO ...
Page 64: ......
Page 67: ......
Page 69: ......
Page 70: ...1 2 3 4 5 6 7 8 9 0 6 6 C B D F G E A B C D E F G J K L M N H ...
Page 116: ...INSP ADJ FUSE INSPECTION TT R125E TT R125LWE ...
Page 288: ......