4 - 48
ENG
CLUTCH AND PRIMARY DRIVEN GEAR
9. Adjust:
●
Push lever position
10. Install:
●
Dowel pins
●
Gasket (right crankcase cover)
●
Right crankcase cover
●
Negative battery lead
(TT-R125E/TT-R125LWE)
1
●
Lead holder
(TT-R125E/TT-R125LWE)
2
●
Bolts (right crankcase cover)
NOTE:
●
Apply Quick gasket
®
(YAMAHA Bond
No.1215) to end of the right crankcase cover
bolts, as shown.
●
Tighten the bolts in stages, using a criss-
cross pattern.
Adjustment steps:
●
Loosen the locknut
1
.
●
Turn the push rod 1
2
clockwise or coun-
terclockwise to match alignment marks.
●
Hold the push rod 1 to prevent it from
moving and tighten the locknut to specifi-
cation.
●
Tighten the locknut
1
.
T
R
.
.
Locknut:
8 Nm (0.8 m • kg, 5.8 ft • lb)
Quick gasket
®
:
ACC-QUICK-GS-KT
YAMAHA Bond No.1215:
90890-85505
New
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
11. Install:
●
Kickstarter crank
1
●
Nut (kickstarter crank)
2
NOTE:
Install the kickstarter crank so that there is 5 ~
10 mm (0.2 ~ 0.4 in)
a
between the kickstarter
crank and the right crankcase cover.
T
R
.
.
50 Nm (5.0 m · kg, 36 ft · lb)
Summary of Contents for TT-R125E(W)
Page 2: ......
Page 14: ...MEMO ...
Page 64: ......
Page 67: ......
Page 69: ......
Page 70: ...1 2 3 4 5 6 7 8 9 0 6 6 C B D F G E A B C D E F G J K L M N H ...
Page 116: ...INSP ADJ FUSE INSPECTION TT R125E TT R125LWE ...
Page 288: ......