–59–
SECONDARY SHEAVE
POWR
TR
INSPECTION
1. Inspect:
S
Sliding sheave
1
S
Fixed sheave
2
S
Spring seat
3
Cracks / damage
!
Replace.
S
Stopper
4
Wear / damage
!
Replace.
2. Inspect:
S
Bushing (spring seat)
1
S
Sliding sheave (V-belt contact surface)
2
Scratches / wear / damage
!
Replace.
S
Sliding bushing
3
Unsymmetrical wear / damage
!
Replace.
3. Inspect:
S
Secondary sheave spring
1
Cracks / damage
!
Replace.
4. Measure:
S
Secondary sheave spring free length
a
Below specification
!
Replace the second-
ary sheave spring.
Free length limit:
69.5 mm (2.736 in)
5. Measure:
S
Ramp shoe thickness
a
Out of specification
!
Replace the ramp
shoe.
Wear limit:
1.0 mm (0.04 in)
ASSEMBLY
1. Install:
S
Stopper
S
Sliding sheave
Screw (stopper):
6.5 Nm (0.65 m
S
kg, 4.6 ft
S
lb)
Summary of Contents for SXV70ERG
Page 1: ...SUPPLEMENTARY SERVICE MANUAL ...
Page 151: ... 145 CABLE ROUTING SPEC ...
Page 153: ... 147 CABLE ROUTING SPEC ...
Page 155: ... 149 CABLE ROUTING SPEC ...
Page 157: ... 151 CABLE ROUTING SPEC ...
Page 159: ... 153 CABLE ROUTING SPEC ...
Page 161: ... 155 CABLE ROUTING SPEC ...
Page 163: ... 157 CABLE ROUTING SPEC ...
Page 165: ... 159 CABLE ROUTING SPEC ...
Page 167: ... 161 CABLE ROUTING SPEC ...
Page 169: ... 163 CABLE ROUTING SPEC ...
Page 173: ... ੑ 01 06 0 8E ITP PRINTED ON RECYCLED PAPER ...