–12–
COOLING SYSTEM
INSP
ADJ
Inspection steps:
S
Attach the cooling system tester
1
to the cool-
ant filler
2
.
Cooling system tester:
90890-01325, YU-24460-01
S
Apply 100 kPa (1.0 kg / cm
2
, 14 psi).
S
Measure the pressure with the gauge.
Air bleeding
1. Remove:
S
Seat
S
Side cover
1
2. Bleed air from the cooling system.
Air bleeding steps:
S
Lift up the tail of the machine.
S
Remove the bleed bolt
1
on the heat ex-
changer.
S
While slowly adding coolant to the coolant fill-
er, drain the coolant until no more air bubbles
appear.
S
Tighten the bleed bolt
1
.
Bleed bolt:
12.5 Nm (1.3 m
S
kg, 9.4 ft
S
lb)
S
Add coolant to the coolant cold level
a
.
S
Loosen the bleed bolt
2
.
S
Drain the coolant until no more air bubbles ap-
pear.
S
Tighten the bleed bolt
2
.
Bleed bolt:
3.5 Nm (0.4 m
S
kg, 2.9 ft
S
lb)
S
Install the coolant filler cap.
Apply and lock the parking brake. Start the en-
gine and run it at approximately 2,500
X
3,000
r / min until the coolant circulates (approxi-
mately 3
X
5 minutes). The side heat ex-
changers will be warm to the touch.
Summary of Contents for SXV70ERG
Page 1: ...SUPPLEMENTARY SERVICE MANUAL ...
Page 151: ... 145 CABLE ROUTING SPEC ...
Page 153: ... 147 CABLE ROUTING SPEC ...
Page 155: ... 149 CABLE ROUTING SPEC ...
Page 157: ... 151 CABLE ROUTING SPEC ...
Page 159: ... 153 CABLE ROUTING SPEC ...
Page 161: ... 155 CABLE ROUTING SPEC ...
Page 163: ... 157 CABLE ROUTING SPEC ...
Page 165: ... 159 CABLE ROUTING SPEC ...
Page 167: ... 161 CABLE ROUTING SPEC ...
Page 169: ... 163 CABLE ROUTING SPEC ...
Page 173: ... ੑ 01 06 0 8E ITP PRINTED ON RECYCLED PAPER ...