POWR
TR
4-8
PRIMARY SHEAVE AND DRIVE V-BELT
3. Install:
•
Fixed sheave stoppers
1
NOTE:
Stopper tapered portion should face fixed sheave.
4. Tighten:
•
Spider
Tightening steps:
•
Finger-tighten the spider until it is stopped by the
fixed sheave stopper.
•
Hold the fixed sheave with the clutch spider
separator
1
.
Clutch spider separator:
YS-28890-C
NOTE:
Securely fit the projections on the clutch separator
adapter
2
into the fixed sheave holes.
•
Tighten the spider to specification using the bar
wrench
3
.
Spider:
200 Nm (20 m · kg, 145 ft · lb)
CAUTION:
The spider has a left-handed thread.
WARNING
•
Do not operate the primary sheave until the
LOCTITE
®
has dried completely. Wait 24 hours
before operating the primary sheave.
•
Since a high torque is required to tighten the
spider, make sure the spider, fixed sheave, and
special tool are well secured. Tighten the spi-
der carefully to prevent cracks and damage to
the sheaves and spider.
SEA4170
SEA4180
T
R
.
.
SEA4190
Summary of Contents for MM600G
Page 1: ...VX600ERG SX600G MM600G VT600G SERVICE MANUAL LIT 12618 02 20 8EA 28197 10 981059 ...
Page 57: ...2 43 INSP ADJ CARBURETORTUNING Guide for carburetion SEA2720 ...
Page 79: ...2 65 INSP ADJ REAR SUSPENSION ...
Page 220: ...8 21 ELEC CHARGING SYSTEM ...
Page 236: ...8 37 ELEC SIGNAL SYSTEM ...
Page 266: ...9 20 SPEC GENERAL TORQUE SPECIFICATIONS DEFINITION OF UNITS ...
Page 267: ...SPEC 9 21 CABLE ROUTING SEA9010 ...
Page 269: ...SPEC 9 23 CABLE ROUTING SEA9010 ...
Page 271: ...SPEC 9 25 CABLE ROUTING SEA9020 ...
Page 273: ...SPEC 9 27 CABLE ROUTING SEA9030 ...
Page 275: ...SPEC 9 29 CABLE ROUTING SEA9030 ...
Page 277: ...SPEC 9 31 CABLE ROUTING SEA9040 ...
Page 279: ...SPEC 9 33 CABLE ROUTING SEA9050 ...
Page 281: ...SPEC 9 35 CABLE ROUTING SEA9050 ...
Page 283: ...SPEC 9 37 CABLE ROUTING SEA9060 ...
Page 287: ...Printed in USA E CR PRINTED ON RECYCLED PAPER ...