
5-4
ENG
1
ENGINE ASSEMBLY
INSPECTION
1. Inspect:
•
Rear bracket (right)
1
Cracks/damage
→
Replace.
INSTALLATION
NOTE:
After installing all parts, refer to “CABLE ROUTING”
in CHAPTER 9, to check the cable, lead and hose
routings.
1. Fasten:
•
Plastic band
1
NOTE:
•
Fasten the carburetor heating hose 3
2
without
squashing it.
•
For VX600ER/VT600:
Clamp the starter motor lead
3
and carburetor
heating hose 3
2
together so that the white tape on
the starter motor lead
3
is positioned behind the
front bracket.
2 .Install:
•
Starter motor lead
1
(VX600ER/VT600)
NOTE:
Route the starter motor lead as shown in the illustra-
tion.
SEA5050
SEA5060
SEA5070
Summary of Contents for MM600G
Page 1: ...VX600ERG SX600G MM600G VT600G SERVICE MANUAL LIT 12618 02 20 8EA 28197 10 981059 ...
Page 57: ...2 43 INSP ADJ CARBURETORTUNING Guide for carburetion SEA2720 ...
Page 79: ...2 65 INSP ADJ REAR SUSPENSION ...
Page 220: ...8 21 ELEC CHARGING SYSTEM ...
Page 236: ...8 37 ELEC SIGNAL SYSTEM ...
Page 266: ...9 20 SPEC GENERAL TORQUE SPECIFICATIONS DEFINITION OF UNITS ...
Page 267: ...SPEC 9 21 CABLE ROUTING SEA9010 ...
Page 269: ...SPEC 9 23 CABLE ROUTING SEA9010 ...
Page 271: ...SPEC 9 25 CABLE ROUTING SEA9020 ...
Page 273: ...SPEC 9 27 CABLE ROUTING SEA9030 ...
Page 275: ...SPEC 9 29 CABLE ROUTING SEA9030 ...
Page 277: ...SPEC 9 31 CABLE ROUTING SEA9040 ...
Page 279: ...SPEC 9 33 CABLE ROUTING SEA9050 ...
Page 281: ...SPEC 9 35 CABLE ROUTING SEA9050 ...
Page 283: ...SPEC 9 37 CABLE ROUTING SEA9060 ...
Page 287: ...Printed in USA E CR PRINTED ON RECYCLED PAPER ...