–8–
N Install the right handlebar switch lead coupler
through the hole of the bracket 2 from the downside.
O Route the starter motor lead by the inner side of the
air cut-off valve hose.
P Pass the ignition coil leads #1 and #4 through inner
side of the air cut-off valve hose, and then between
the frame and bracket 2.
Q To the sub-wire harness.
I Pull down the mark-painted sections of the fuel tank
breather hose, fuel tank drain hose and coolant res-
ervoir tank breather hose to be lower than the clamp
position of the muffler stay. Any order to take out the
fuel tank breather hose and fuel tank drain hose can
be accepted.
J Pass the fuel tank breather hose, fuel tank drain
hose, coolant reservoir tank breather hose and
brake right switch lead through the guide of the stay
assembly 2.
K Clamp the tail brake light switch lead together with
the brake fluid reservoir hose.
L Pass the neutral switch lead between the engine
and coolant reservoir tank bracket.
M To the starter motor.
CABLE ROUTING
SPEC
Summary of Contents for FZ6-N 2004
Page 1: ......
Page 2: ......
Page 11: ... 3 COOLING SYSTEM DIAGRAMS SPEC 1 Radiator 2 Oil cooler COOLING SYSTEM DIAGRAMS ...
Page 12: ... 4 COOLING SYSTEM DIAGRAMS SPEC 1 Water pump 2 Oil cooler 3 Radiator ...
Page 13: ... 5 COOLING SYSTEM DIAGRAMS SPEC 1 Radiator 2 Thermostat ...
Page 58: ... 50 LIGHTING SYSTEM ELEC EAS00780 LIGHTING SYSTEM CIRCUIT DIAGRAM ...
Page 65: ... 57 57 SIGNALING SYSTEM ELEC EAS00793 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 75: ......
Page 76: ......