–63–
63
SIGNALING SYSTEM
ELEC
YES
NO
Replace the starting
circuit cut-off relay.
YES
NO
4. Voltage
S
Connect the pocket tester (DC 20 V) to the
meter assembly coupler (wire harness side)
as shown.
The wiring circuit
from the main switch
to the meter assem-
bly coupler is faulty
and must be re-
paired.
Negative tester probe
!
ground
Positive tester probe
!
red / white
1
S
Turn the main switch to “ON”.
S
Measure the voltage (DC 12 V) of red / white
at the meter assembly coupler (wire harness
side).
S
Is the voltage within specification?
This circuit is OK.
S
Are the tester readings correct?
YES
NO
1. Oil level warning light (LEDs)
S
Check the oil level warning light for continu-
ity.
When the main switch is turn to “ON”, the oil
level warning light is come on.
S
Are the oil level warning light OK?
Replace the meter
assembly.
EAS00802
5. The oil level warning light fails to come on.
YES
NO
2. Oil level switch
S
Drain the engine oil and remove the oil level
switch from the oil pan.
S
Connect the pocket tester (
Ω
100) to the
oil level switch as shown.
Replace the oil level
switch.
Positive tester probe
!
Connector
(white)
Negative tester probe
!
Body ground
1
1
2
S
Measure the oil level switch resistance.
Oil level switch resistance
114
X
126
Ω
at 20
_
C (68
_
F)
484
X
536
Ω
at 20
_
C (68
_
F)
1
2
S
Is the oil level switch OK?
2
Summary of Contents for FZ6-N 2004
Page 1: ......
Page 2: ......
Page 11: ... 3 COOLING SYSTEM DIAGRAMS SPEC 1 Radiator 2 Oil cooler COOLING SYSTEM DIAGRAMS ...
Page 12: ... 4 COOLING SYSTEM DIAGRAMS SPEC 1 Water pump 2 Oil cooler 3 Radiator ...
Page 13: ... 5 COOLING SYSTEM DIAGRAMS SPEC 1 Radiator 2 Thermostat ...
Page 58: ... 50 LIGHTING SYSTEM ELEC EAS00780 LIGHTING SYSTEM CIRCUIT DIAGRAM ...
Page 65: ... 57 57 SIGNALING SYSTEM ELEC EAS00793 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 75: ......
Page 76: ......