2-27
SPEC
1
Coupler cover
2
Sidestand switch lead
3
Sidestand switch
4
ACM Lead
5
Clamp
È
All the couplers shall be properly covered with
couplers cover, after connecting. Layout of leads
can be in random order.
É
Band shall be touched to frame.
Ê
Clamp shall be touched to band.
Ë
Band shall be wrapped to frame and fix the
inserted part to lower side.
Ì
After clamp sidestand switch lead shall be
adjusted without slack.
Í
Layout of leads in clamp shall be in random
order.
Î
Set the tip of the clamp to the inner side, tip of
the clamp shall not be cut.
Ï
Set the tip of the clamp to the upper side, tip of
the clamp shall not be cut, clamp threading
direction is not required.
Ð
Pass the clamp from the lower side of bracket.
Ñ
Set the tip of the clamp to the lower side, tip of
the clamp shall be cut 5 mm maximum, clamp
threading direction is not required.
B9X-F8197-E0.book Page 27 Thursday, July 16, 2020 2:28 PM
Summary of Contents for FZ 25 2021
Page 1: ......
Page 7: ...B9X F8197 E0 book Page 6 Thursday July 16 2020 2 28 PM ...
Page 9: ...GEN INFO B9X F8197 E0 book Page 2 Thursday July 16 2020 2 28 PM ...
Page 35: ...1 26 GEN INFO B9X F8197 E0 book Page 26 Thursday July 16 2020 2 28 PM ...
Page 37: ...SPEC B9X F8197 E0 book Page 2 Thursday July 16 2020 2 28 PM ...
Page 89: ...CHAS B9X F8197 E0 book Page 1 Thursday July 16 2020 2 28 PM ...
Page 121: ...ENG B9X F8197 E0 book Page 1 Thursday July 16 2020 2 28 PM ...
Page 128: ...5 7 ENG B9X F8197 E0 book Page 7 Thursday July 16 2020 2 28 PM ...
Page 238: ...TRBL SHTG B9X F8197 E0 book Page 2 Thursday July 16 2020 2 28 PM ...
Page 243: ...7 5 TRBL SHTG TROUBLESHOOTING B9X F8197 E0 book Page 5 Thursday July 16 2020 2 28 PM ...
Page 245: ...B9X F8197 E0 book Page 1 Thursday July 16 2020 2 28 PM ...
Page 247: ...B9X F8197 E0 87 7 B9X F8197 E0 book Page 2 Thursday July 16 2020 2 28 PM ...