61U5H11
7-4
9
8
7
6
5
4
3
2
1
Tiller handle
Checking the throttle cable and shift
cable
1.
Check that the operation of the throttle
cable and shift cable.
2.
Check the inner wire, outer wire of the
throttle cable and shift cable. Replace if
the outer wire is bent or damaged and
the rubber seals are damaged.
Assembling the tiller handle
1.
Install the throttle shaft
1
into the tiller
handle
2
so that the pin
3
of the throttle
shaft
1
aligned with the mating surface
of the tiller handle
2
in horizontal posi-
tion.
2.
Insert the throttle cable
4
into the gear
5
until the inner cable is engaged with
the gear.
3.
Turn the throttle shaft
1
clockwise to
wind the inner cable around the gear
5
.
4.
Tighten the nut
6
.
5.
Install the bushing
7
, spring
8
, throttle
grip
9
and cover
0
into the tiller handle
2
.
Lubricating the throttle gear
1.
Inject grease into the grease nipple until
grease comes out from the screw hole
a
.
1
3
2
A
2
61U70470
3
61U70480
6
4
5
69D70170
a
A
2
7
8
0
9
61U70490
A
A
Lock nut
6
:
11 N·m (1.1 kgf·m, 8.1 ft·lb)
61U5H11_07_1 06.2.13 1:24 PM Page 7
Summary of Contents for E115A
Page 1: ...115B SERVICE MANUAL 61U 28197 5H 11 140B E115A E115A 115B 140B ...
Page 4: ......
Page 79: ...61U5H11 4 18 9 8 7 6 5 4 3 2 1 MEMO ...
Page 136: ...POWR 5 55 61U5H11 Power unit MEMO ...
Page 159: ...61U5H11 6 22 9 8 7 6 5 4 3 2 1 Shimming Shimming 6G46090E T3 M3 M4 M1 M2 T1 T2 F R P ...
Page 255: ......