POWR
5-45
61U5H11
Power unit
10. Tighten the crankcase bolts to the speci-
fied torques in 2 stages and in the
sequence shown.
NOTE:
Tighten crankcase bolts
z
–
n
to the speci-
fied torques in 2 stages first, and then tighten
crankcase bolts
m
–
⁄4
to the specified
torques in 2 stages.
11. Tighten the bearing housing bolts and oil
seal housing bolts.
61U50270
z
–
n
: Crankcase bolt (M10):
1st: 20 N·m (2.0 kgf·m, 14.8 ft·lb)
2nd: 37 N·m (3.7 kgf·m, 27.3 ft·lb)
m
–
⁄4
: Crankcase bolt (M8):
1st: 10 N·m (1.0 kgf·m, 7.4 ft·lb)
2nd: 18 N·m (1.8 kgf·m, 13.3 ft·lb)
Bearing housing bolt:
12 N·m (1.2 kgf·m, 8.9 ft·lb)
12. Install the new gasket
5
, exhaust inner
cover
6
, new gasket
7
, exhaust outer
cover
8
, and then tighten the exhaust
cover bolts to the specified torques in 2
stages and in the sequence shown.
NOTE:
Apply LOCTITE 572 to the exhaust cover
bolts before installation.
61U50110
Exhaust cover bolt:
1st: 4 N·m (0.4 kgf·m, 3.0 ft·lb)
2nd: 8 N·m (0.8 kgf·m, 5.9 ft·lb)
7
8
5
6
61U50780
61U5H11_05_1 06.2.10 17:22 Page 48
Summary of Contents for E115A
Page 1: ...115B SERVICE MANUAL 61U 28197 5H 11 140B E115A E115A 115B 140B ...
Page 4: ......
Page 79: ...61U5H11 4 18 9 8 7 6 5 4 3 2 1 MEMO ...
Page 136: ...POWR 5 55 61U5H11 Power unit MEMO ...
Page 159: ...61U5H11 6 22 9 8 7 6 5 4 3 2 1 Shimming Shimming 6G46090E T3 M3 M4 M1 M2 T1 T2 F R P ...
Page 255: ......