4-5
ENGINE
ENG
NOTE:
EAS00192
INSTALLING THE ENGINE
1. Tighten the bolts in the following order.
Bolt
1
:
48 Nm (4.8 m
kg)
Bolt
2
:
48 Nm (4.8 m
kg)
Bolt
3
:
48 Nm (4.8 m
kg)
Bolt
4
:
48 Nm (4.8 m
kg)
Bolt
5
:
48 Nm (4.8 m
kg)
2. Install:
shift arm
1
Align the punch mark
a
in the shift shaft with
the slot in the shift arm.
Adjust the adjusting bolt length
b
.
Refer to “ADJUSTING THE SHIFT PEDAL” in
chapter 3.
Shift arm bolt
10Nm (1.0m
kg)
Adjusting bolt length
114.7mm
Summary of Contents for 1999 XVS1100
Page 1: ......
Page 7: ...GEN INFO 1 ...
Page 17: ...SPEC 2 ...
Page 28: ...2 10 MAINTENANCE SPECIFICATIONS SPEC Item Standard Lubrication chart ...
Page 42: ...2 24 4 Middle drive shaft 1 Oil pump 2 Releaf valve 3 Oil filter LUBRICATION DIAGRAMS SPEC ...
Page 54: ...INSP ADJ 3 ...
Page 102: ...ENG 4 ...
Page 188: ...CARB 5 ...
Page 201: ...CARB ...
Page 202: ...CHAS 6 ...
Page 293: ...ELEC 7 ...
Page 326: ...7 31 SIGNAL SYSTEM ELEC EB806000 SIGNAL SYSTEM CIRCUIT DIAGRAM ...
Page 346: ...TRBL SHTG 8 ...