Turb PLUS 2000
Installation
12
100193 Rev 0 ba77254e01 11/2020
Site Selection
Choose a site that is accessible and well-lighted for use, servicing, repair or
replacement by authorized personnel.
Turb PLUS 2000 should be located and mounted within 2-3 meters (6 to10 ft) of the sampling
point to ensure a quick response time.
Installation/mounting site must be isolated from vibration, and not susceptible to freezing or
temperature extremes.
The site must have a suitable vertical and flat surface that can support the product’s weight and
service operations 5kg (10lbs).
There should be 20 cm (8 in) free area above the instrument. This will ensure enough room for
calibration and cuvette maintenance.
The site must allow for mounting Turb PLUS 2000 with the front display positioned at eye level 1.4
to 2 meters (approximately 4.5 to 6.5 feet from the floor).
Turb PLUS 2000 is designed to have the Junction Box cradled under the upper portion of the
instrument – Select a site with enough space for proper configuration when mounted.
Mounting
Described is for installation to a concrete surface. If needed contact
Xylem Analytics Germany for instruction to install on other surfaces.
Tools required:
•
Appropriate screwdriver or driver gun.
•
Mounting Template – last page of this Manual.
•
Masking tape for attaching Mounting Template to the wall.
•
Any tools required by wall anchor manufacturer if used.
Hardware required:
•
4 Mounting screws for instrument enclosure - M6 (¼”). Either use concrete screws or use a wall
anchors & the supplied screws.
•
2 Mounting screws for terminal junction box - M4 (#8). Either use concrete screws or use a wall
anchors & the supplied screws.