Alyza IQ PO4
Commissioning
59
ba76201d03
05/2020
Reinserting the
mounting plate
3.3.14 Mounting the collection funnel
The liquid waste from the measuring unit and sample overflow from the overflow
vessels have to be transported out of the housing of the Alyza IQ.
The collection funnel collects the liquids from up to 3 sources (waste tube from
the measuring unit, sample overflow tube from overflow vessel 1 and sample
overflow tube from overflow vessel 2 ) and transports them out of the housing
via a common return line.
To keep moisture and damp air from penetrating the housing of the Alyza IQ, the
collection funnel is closed with a rubber cover. Unused openings of the rubber
cover are closed with plugs.
The collection funnel is installed in the housing of the Alyza IQ at the
second cable gland from the front.
31
Insert the mounting plate:
Plug the mounting plate on the threaded pins inside the housing.
Tighten the 2 fixing screws (2) at the upper edge of the mounting
plate.
Tighten the 2 fixing nuts (3) at the bottom of the mounting plate.
32
Re-establish the cable connections and the connection of the tubes and
liquid lines.
Connect the 2 cables to the switch box.
Mount the collection funnel:
– the collection funnel for the chemical waste and, if necessary,
– the second collection funnel for the sample overflow from the
overflow vessels.
Plug the intake lines onto the connectors of the filtration pumps.
Screw the sample tubes to the connectors of the overflow vessels.
Re-insert the sample overflow tubes into the collection funnel for the
sample overflow or into the joint collection funnel for chemical waste
and sample overflow.
Connect the liquid lines (see section 3.3.17 Connecting the tubes
and liquid lines,
66).
Insert the sample return tubes of the overflow vessels in the collec-
tion funnels:
33
Reinsert the cover and fix it with the 2 fixing nuts.
Summary of Contents for WTW Alyza IQ PO4
Page 171: ......