5.13 Recommissioning the Alyza IQ
Is the Alyza IQ prepared for transport or storage (see section 5.11
Decommissioning,
144)?
Is the system empty (tubes, MultiPort valve, photometer unit) ?
Are the overflow vessels empty?
Alyza IQWere the ChemBags removed from the supporting rod?
Is the measuring unit fixed inside the housing with the 3 original
transportation safety devices?
Are the housing doors closed and secured against inadvertent open-
ing?
Is the housing secured against shock, falling, overturning and slid-
ing?
15
Transport or store the Alyza IQ.
16
Always transport or store the ChemBags separately from the measuring
unit or housing of the Alyza IQ.
On recommissioning, the data of the last used components (measur-
ing unit, ChemBags) are automatically used again.
Installing any components with the Install wizard is only required it
other components should be installed.
1
For recommissioning, proceed in the same way as for the initial com-
missioning (see section 3 Commissioning,