66
The flow meter prepared in this way is screwed to the oven and the hose connected to the gas inlet of the oven
(Fig. 26).
Fig. 26
With the second TZ 3993 tube, the gas outlet on the needle head (Fig. 27) is screwed to the gas inlet tip on the
titration cell (Fig. 28).
Fig. 27
Fig. 28