background image

Heat / Cooling Meters Calculator Unit  
PolluTherm can be combined with PolluFlow 
Installation and Operating Instructions 

 

 

MH 6114 INT PolluTherm, Page 9 

 

Actual output 

 

Temperature in the warm 
pipe 

 

Temperature in the 
cooling pipe 

 

Temperature difference  

 

Customer-specific 
number  

 

Primary M-Bus address 
(factory setting: 0) * 

 

Secondary M-Bus 
address 
(Factory setting: 
Serial number) * 

 
 

7.2 Due date Level (Example) 

 
All display positions are indicated by an arrow. 
Display of all values are saved to an adjustable 
due date in the year. 
 

 

Due date value 
for heating and cooling 
energy 

 

Due date value 
for volumes 

 

Due date value for Tariff 

(if activated) * 

 

Due date value for Tariff 
cooling (if activated) * 

 

Due date value for the 
first external meter * 

 

Due date value for the 
second external meter * 

 

Return to the selection 
menu 
(press for 2 seconds) 

Summary of Contents for SENSUS PolluTherm

Page 1: ...ing Meters Calculator Unit PolluTherm can be combined with PolluFlow Installation and Operating Instructions MH 6114 INT PolluTherm Page 1 PolluTherm PolluFlow compatible Installation and Operating In...

Page 2: ...ule for M Bus slot 14 10 6 LONWORKS FTT10A 14 10 7 Inserting the Plug In Modules into the Calculator Unit 14 10 8 Combined Heat Cooling Meter Order Option 14 10 9 Optional Integrated Data Logger Order...

Page 3: ...Discharged batteries electronic devices or components that are no longer required must be disposed of as hazardous waste at suitable collection points If multiple meters are used in a billing unit sim...

Page 4: ...sensor should be installed in the heating flow or the warm pipe The direction of flow is indicated by an arrow on the housing The permitted operating pressure and operating temperature must not be exc...

Page 5: ...7 5 They are supplied up to R1 DN 25 The EN 1434 2 can be used as a general installation guideline When using Sensus temperature sensors with the installation lengths of 100 mm and 150 mm the active m...

Page 6: ...blish strain relief using a cable tie Figure 9 The pulse line white is connected to the terminal 10 and the line GND blue connected to the terminal 11 The terminal 9 is provided for the voltage supply...

Page 7: ...ollowing allocation applies Supply temperature sensor warm pipe Type of connection Terminals Two wire system 5 6 Four wire system 5 6 and 1 2 Pos available shielding Return temperature sensor cooling...

Page 8: ...ive levels can be accessed by pressing the red button for 8 seconds The selection menu appears L1 to L6 User level Due Date level Archive level Service level Control level for tariff purposes Paramete...

Page 9: ...ting 0 Secondary M Bus address Factory setting Serial number 7 2 Due date Level Example All display positions are indicated by an arrow Display of all values are saved to an adjustable due date in the...

Page 10: ...the second external meter Maximum flow in the selected month with date averaged Maximum flow in the selected month with time averaged Maximum energy in the selected month with date averaged Maximum e...

Page 11: ...point for inlet flow temperature cooling metering if activated Switching point for outlet temperature difference cooling metering if activated Correction factor for water frost protection mixture if a...

Page 12: ...n point of the temperature sensors Cover of the calculator unit pull lockwire through the eyelet at the bottom edge 9 Possible Error Situations PolluTherm is equipped with an automatic self monitoring...

Page 13: ...g The primary address can be set at between 0 and 250 and when delivered factory default is set at 0 Battery devices have an M Bus credit as such the daily read out is limited depending on the number...

Page 14: ...omatic switching point The factory setting for switching to cooling metering is Flow temperature 25 C and Negative temperature differential 0 15 K To switch back to warm metering the following applies...

Page 15: ...able for the temperature sensors can be extended to a maximum of approx 23 m In order to compensate for the additional cable resistance the so called four wire system is used Cable with four wires is...

Page 16: ...Heat Cooling Meters Calculator Unit PolluTherm can be combined with PolluFlow Installation and Operating Instruction MH 6114 INT PolluTherm Page 16...

Page 17: ...Heat Cooling Meters Calculator Unit PolluTherm can be combined with PolluFlow Installation and Operating Instructions MH 6114 INT PolluTherm Page 17...

Page 18: ...Heat Cooling Meters Calculator Unit PolluTherm can be combined with PolluFlow Installation and Operating Instruction MH 6114 INT PolluTherm Page 18...

Page 19: ...Heat Cooling Meters Calculator Unit PolluTherm can be combined with PolluFlow Installation and Operating Instructions MH 6114 INT PolluTherm Page 19...

Page 20: ...tallation and Operating Instruction MH 6114 INT PolluTherm Page 20 Material number 28505234 Version 10 2021 0007 subject to modifications Sensus GmbH Ludwigshafen Industriestra e 16 D 67063 Ludwigshaf...

Reviews: