14
Install to ABYC
H-22 and E-11
All mounting holes must be
sealed with a marine grade
sealant to prevent water
intrusion.
AIS (Aquatic Invasive Species)
Decontamination Process.
All of our pumps are designed to meet the ABYC standards
for the current AIS Decontamination procedure including low
pressure water at 120ºF for 130 seconds.
Please follow current guidelines for the decontamination
process.
Summary of Contents for rule Rule-Mate
Page 8: ...8 2 3 4 69 85mm 5 8 15 88mm STOP ARR T STOPP ALTO Pump 1500 2000 GPH...
Page 9: ...9 Pump 1500 2000 GPH...
Page 10: ...10 Pump 1500 2000 GPH...
Page 12: ...12...
Page 51: ......