Operation Manual
44
Operator Cab
The Telehandler includes a Frame Sway
Override switch. Improper use of the Frame
Sway Override switch could cause death,
serious injury, or property damage.
NOTE:
Lock the frame sway by placing the travel select lever
in NEUTRAL or applying the service or parking brake.
NOTE:
Maximum frame sway is 220 overall or 110 each
direction, left and right.
Warning
Lights Switch
Figure 53. Frame Sway Override Switch
The frame sway feature becomes locked and will not operate
when the boom is raised 40° or more. Pressing the Frame Sway
Enable switch on the joystick will override the lockout feature
and allow slow frame sway.
Flip the toggle switch to ON to turn the front lights on.
Figure 54. Lights Switch
Auxiliary Attachment Control
Frame Sway Control
Function
Action
Frame sway right Press sway enable & move joystick right
Frame sway left
Press sway enable & move joystick left
Figure 52. Attachment Tilt Control Thumbstick (A)
(1) Attachment Tilt Down (2) Attachment Tilt Up
1
2
FRONT
OF
VEHICLE
A
The Sway Enable button on the joystick is used to enable
the machine frame sway before lifting any loads. This button
needs to be depressed at all times while the joystick is moved
sideways for frame sway purposes. The joystick needs to be
centered when the Sway Enable button is depressed, other-
wise if the joystick is off-center it will not work and a message
will pop up on the screen asking to return the joystick to the
center position before operating a function.
Boom Maintenance Stand (If Equipped)
The Boom Maintenance Stand is an optional safety
equipment used to support the boom during
maintenance activities where the boom is raised
and must
be stowed during normal operation. Use while driving or
with the boom loaded is not permitted.
T
o set boom stand, make sure machine is on a flat level
ground and machine has no load on the forks. Raise machine
boom to 40 degrees for clearance and remove latch and
pin from boom stand weldment. Position the boom stand
in the upright position and re-apply the pin to secure
stand. Proceed by slowly lowering machine boom to lay on
stand.
When
stowing the
boom stand,
r
aise
the
boom
to 40 degrees for clearance and remove
the
pin from
the
stand weldment Lay
the
boom stand in the down
position and re-latch
it
to secure.