Status Indicator RAPs
2-4
11/05
Workcentre PE 220
Initial Inspection
1. Check the power.
1. The machine does not work no matter how long you wait.
A. Is the Power Switch (machine and wall socket) turned on?
B. Is the Power Cord connected to the machine correctly?
C. Is the Power cord connected to the wall socket correctly?
D. Is wall socket working?
E. Is the unit rated at the same voltage as the supply?
2. Does the Fan work when power is turned on?
A. Check the connectors on the SMPS.
B. Check the fuses in the SMPS (F1).
2. Check the Installation Environment.
1. Ensure the installation surface is flat, level and free from vibration.
If necessary move the machine.
2. Ensure that the temperature and humidity of the surroundings are within specification
If necessary move the machine.
3. Ensure that the machine is positioned away from any air conditioning or other heating or cool-
ing equipment. Also ensure that is not positioned in a direct draft from any air conditioning,
fan or open window.
If necessary move the machine.
4. Ensure the machine is not positioned in direct sunlight.
If it is unavoidable use a curtain to shade the machine.
5. Ensure the machine is installed in a clean dust free environment.
Move the machine to clean area if necessary.
6. Some industrial or cleaning processes give of fumes which can affect the machine.
Move the machine away from this type of air pollution
3. Check paper type.
1. Use only paper which is of a suitable quality, weight and size.
See the user guide.
4. Check the overall condition of the machine
1. Clean the Paper Transport areas.
Any rollers with dirt surfaces should be cleaned or replaced.
Summary of Contents for WORKCENTRE PE 220
Page 1: ...11 05 WORKCENTRE PE 220 SERVICE MANUAL 708P88337...
Page 4: ...Introduction ii 11 05 Workcentre PE 220 Page intentionally blank...
Page 14: ...Service Call Procedures 1 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 18: ...Status Indicator RAPs 2 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 46: ...Status Indicator RAPs 2 30 11 05 Workcentre PE 220 Page intentionally blank...
Page 48: ...Image Quality 3 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 64: ...Image Quality 3 18 11 05 Workcentre PE 220 Page intentionally blank...
Page 66: ...Repairs Adjustments 4 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 88: ...Repairs Adjustments 4 24 11 05 Workcentre PE 220 Page intentionally blank...
Page 90: ...Spare Parts List 5 2 11 05 Workcentre PE 220 PL 1 Main Assembly...
Page 92: ...Spare Parts List 5 4 11 05 Workcentre PE 220 PL 2 ADF Assembly...
Page 94: ...Spare Parts List 5 6 11 05 Workcentre PE 220 PL 3 Platen Cover Assembly...
Page 96: ...Spare Parts List 5 8 11 05 Workcentre PE 220 PL 4 ADF Platen Assembly...
Page 98: ...Spare Parts List 5 10 11 05 Workcentre PE 220 PL 5 OPE Unit...
Page 100: ...Spare Parts List 5 12 11 05 Workcentre PE 220 PL 6 Paper Path Assembly...
Page 102: ...Spare Parts List 5 14 11 05 Workcentre PE 220 PL 7 Fuser Unit...
Page 104: ...Spare Parts List 5 16 11 05 Workcentre PE 220 PL 8 Main Frame Assembly...
Page 106: ...Spare Parts List 5 18 11 05 Workcentre PE 220 PL 9 MP Tray Assembly...
Page 110: ...General Procedures Information 6 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 122: ...General Procedures and Information 6 14 11 05 Workcentre PE 220 Scanner Figure 2...
Page 127: ...General Procedures and Information Workcentre PE 220 11 05 6 19 LSU Figure 1 Figure 2...
Page 167: ...General Procedures and Information Workcentre PE 220 11 05 6 59 Service log...
Page 168: ...General Procedures and Information 6 60 11 05 Workcentre PE 220 Page intentionally blank...
Page 170: ...Wiring Diagrams 7 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 171: ...Wiring Diagrams Workcentre PE 220 11 05 7 3 WD 1 System Block Diagram...
Page 172: ...Wiring Diagrams 7 4 11 05 Workcentre PE 220 WD 2 PJ Locations...
Page 173: ...Wiring Diagrams Workcentre PE 220 11 05 7 5 WD 3 Connection Diagram 1 2...
Page 174: ...Wiring Diagrams 7 6 11 05 Workcentre PE 220 WD 4 Connection Diagram 2 2...
Page 175: ...Wiring Diagrams Workcentre PE 220 11 05 7 7 WD 5 Main Board 1 7...
Page 176: ...Wiring Diagrams 7 8 11 05 Workcentre PE 220 WD 6 Main Board 2 7...
Page 177: ...Wiring Diagrams Workcentre PE 220 11 05 7 9 WD 7 Main Board 3 7...
Page 178: ...Wiring Diagrams 7 10 11 05 Workcentre PE 220 WD 8 Main Board 4 7...
Page 179: ...Wiring Diagrams Workcentre PE 220 11 05 7 11 WD 9 Main Board 5 7...
Page 180: ...Wiring Diagrams 7 12 11 05 Workcentre PE 220 WD 10 Main Board 6 7...
Page 181: ...Wiring Diagrams Workcentre PE 220 11 05 7 13 WD 11 Main Board 7 7...
Page 182: ...Wiring Diagrams 7 14 11 05 Workcentre PE 220 WD 12 LIU...
Page 183: ...Wiring Diagrams Workcentre PE 220 11 05 7 15 WD 13 OPE...
Page 184: ...Wiring Diagrams 7 16 11 05 Workcentre PE 220 WD 14 LSU...
Page 185: ...Wiring Diagrams Workcentre PE 220 11 05 7 17 WD 15 ADF...
Page 186: ...Wiring Diagrams 7 18 11 05 Workcentre PE 220 WD 16 SMPS...
Page 187: ...Wiring Diagrams Workcentre PE 220 11 05 7 19 WD 17 HVPS 1 3...
Page 188: ...Wiring Diagrams 7 20 11 05 Workcentre PE 220 WD 18 HVPS 2 3...
Page 189: ...Wiring Diagrams Workcentre PE 220 11 05 7 21 WD 19 HVPS 3 3...
Page 190: ...Wiring Diagrams 7 22 11 05 Workcentre PE 220 Page intentionally blank...