General Procedures and Information
6-44
11/05
Workcentre PE 220
Detail Description (Engine Test Mode)
Table 1:
01.Motor Test
The main motor starts when the execution key is pressed
and stops when the stop key is pressed.
Main Motor On/Off
02.Pick Up Test
Automatically stops, when the execution is chosen.
stops, when the execution is chosen.
Tray 1,2 Solenoid On/Off
03.Fan Test
The fan starts when the execution key is pressed and
stops when the stop key is pressed.
Fan On/Off
04.Manual Clutch
Test
The tray2,3 clutch is on for 1sec and then it automatically
stops, when the execution is chosen.On this function,
the main motor runs before 2sec from the point of the
clutch
on in order to check the clutch state.
Tray 2,3 Clutch On/Off
05.PTL Test
PTL (Pre-Transfer Lamp) is lights when the execution key
chosen and it stops when the stop key is chosen.
PTL On/Off
11.LSU Motor
The laser motor starts when the execution key is pressed
and stops when the stop key is pressed.
Laser Motor On/Off
12.LSU Hsync Test The LSU motor starts and "Laser Ready" is displayed if
the motor spins at the correct speed, otherwise "Laser
Error" is displayed.
Laser Ready On/Off
13.LD Test
"Diode On" is displayed, when the laser diode is on.
Otherwise "Diode Off" is displayed.
Diode On/Off
21.Feed Sen Test
These functions allow the current state of the sensor to be
displayed.
"Sensor Off" or “Sensor
On”
22.Exit Sen Test
23.Cover Sen Test
This function allows the current state of the Cover sensor
to be displayed. Touch the sensor and confirm that the
message changes: "Cover Open" to "Cover Close"
"Cover Open" or "Cover
Close"
24.Empty Sen Test These functions allow the current state of the sensor to be
displayed.
"Sensor Off" or “Sensor
On”
25.Manual Sen Test
31.Them ADC 180
"Current value" is displayed on the upper line of the LCD,
and "Target value" on the bottom line.
Target value is limited from "191°C" to "80°C"
Target temperature and
output temperature from
thermistor and ADC.
32.Them ADC 140
33.Them ADC 120
34.Them ADC 100
41.MHV Test
These Functions are provided to check whether the
control of the HVPS is functioning correctly.
MHV On/Off
42.Dev Bias Test
Dev Bias On/Off
43.THV EN/NEG
Test
THV EN/NEG On/Off
44.THV ON(1300V)
THV On/Off
45.THV ADC 1300V
ADC value displayed.
46.THV ADC
600V~3500
ADC value displayed.
Summary of Contents for WORKCENTRE PE 220
Page 1: ...11 05 WORKCENTRE PE 220 SERVICE MANUAL 708P88337...
Page 4: ...Introduction ii 11 05 Workcentre PE 220 Page intentionally blank...
Page 14: ...Service Call Procedures 1 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 18: ...Status Indicator RAPs 2 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 46: ...Status Indicator RAPs 2 30 11 05 Workcentre PE 220 Page intentionally blank...
Page 48: ...Image Quality 3 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 64: ...Image Quality 3 18 11 05 Workcentre PE 220 Page intentionally blank...
Page 66: ...Repairs Adjustments 4 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 88: ...Repairs Adjustments 4 24 11 05 Workcentre PE 220 Page intentionally blank...
Page 90: ...Spare Parts List 5 2 11 05 Workcentre PE 220 PL 1 Main Assembly...
Page 92: ...Spare Parts List 5 4 11 05 Workcentre PE 220 PL 2 ADF Assembly...
Page 94: ...Spare Parts List 5 6 11 05 Workcentre PE 220 PL 3 Platen Cover Assembly...
Page 96: ...Spare Parts List 5 8 11 05 Workcentre PE 220 PL 4 ADF Platen Assembly...
Page 98: ...Spare Parts List 5 10 11 05 Workcentre PE 220 PL 5 OPE Unit...
Page 100: ...Spare Parts List 5 12 11 05 Workcentre PE 220 PL 6 Paper Path Assembly...
Page 102: ...Spare Parts List 5 14 11 05 Workcentre PE 220 PL 7 Fuser Unit...
Page 104: ...Spare Parts List 5 16 11 05 Workcentre PE 220 PL 8 Main Frame Assembly...
Page 106: ...Spare Parts List 5 18 11 05 Workcentre PE 220 PL 9 MP Tray Assembly...
Page 110: ...General Procedures Information 6 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 122: ...General Procedures and Information 6 14 11 05 Workcentre PE 220 Scanner Figure 2...
Page 127: ...General Procedures and Information Workcentre PE 220 11 05 6 19 LSU Figure 1 Figure 2...
Page 167: ...General Procedures and Information Workcentre PE 220 11 05 6 59 Service log...
Page 168: ...General Procedures and Information 6 60 11 05 Workcentre PE 220 Page intentionally blank...
Page 170: ...Wiring Diagrams 7 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 171: ...Wiring Diagrams Workcentre PE 220 11 05 7 3 WD 1 System Block Diagram...
Page 172: ...Wiring Diagrams 7 4 11 05 Workcentre PE 220 WD 2 PJ Locations...
Page 173: ...Wiring Diagrams Workcentre PE 220 11 05 7 5 WD 3 Connection Diagram 1 2...
Page 174: ...Wiring Diagrams 7 6 11 05 Workcentre PE 220 WD 4 Connection Diagram 2 2...
Page 175: ...Wiring Diagrams Workcentre PE 220 11 05 7 7 WD 5 Main Board 1 7...
Page 176: ...Wiring Diagrams 7 8 11 05 Workcentre PE 220 WD 6 Main Board 2 7...
Page 177: ...Wiring Diagrams Workcentre PE 220 11 05 7 9 WD 7 Main Board 3 7...
Page 178: ...Wiring Diagrams 7 10 11 05 Workcentre PE 220 WD 8 Main Board 4 7...
Page 179: ...Wiring Diagrams Workcentre PE 220 11 05 7 11 WD 9 Main Board 5 7...
Page 180: ...Wiring Diagrams 7 12 11 05 Workcentre PE 220 WD 10 Main Board 6 7...
Page 181: ...Wiring Diagrams Workcentre PE 220 11 05 7 13 WD 11 Main Board 7 7...
Page 182: ...Wiring Diagrams 7 14 11 05 Workcentre PE 220 WD 12 LIU...
Page 183: ...Wiring Diagrams Workcentre PE 220 11 05 7 15 WD 13 OPE...
Page 184: ...Wiring Diagrams 7 16 11 05 Workcentre PE 220 WD 14 LSU...
Page 185: ...Wiring Diagrams Workcentre PE 220 11 05 7 17 WD 15 ADF...
Page 186: ...Wiring Diagrams 7 18 11 05 Workcentre PE 220 WD 16 SMPS...
Page 187: ...Wiring Diagrams Workcentre PE 220 11 05 7 19 WD 17 HVPS 1 3...
Page 188: ...Wiring Diagrams 7 20 11 05 Workcentre PE 220 WD 18 HVPS 2 3...
Page 189: ...Wiring Diagrams Workcentre PE 220 11 05 7 21 WD 19 HVPS 3 3...
Page 190: ...Wiring Diagrams 7 22 11 05 Workcentre PE 220 Page intentionally blank...