General Procedures and Information
Workcentre PE 220
11/05
6-27
Fuser AC Power Control
The Fuser (HEAT LAMP) gets heat from AC power. The AC power controls the switch with the
Triac, a semiconductor switch. The 'ON/OFF control' is operated when the gate of the Triac is
turned on/off by Phototriac. In other words, the AC control part is a passive circuit, so it turns the
heater on/off with taking signal from engine control part.
When the 'HEATERON' signal is turned on at engine, the LED of PC102 (Photo Triac) takes the
voltage and flashes. From the flashing light, the Triac part (light receiving part) takes the voltage
and the voltage is supplied to the gate of Triac and flows into the Triac. As a result, the AC current
flows in the heat lamp, and heat is occurred.
On the other hand, when the signal is off, the PC102 is off, the voltage is cut off at the gate of
Triac, the Triac becomes off, and then the heat lamp is turned off.
1) Triac feature: 12A, 600V SWITCHING
2) Phototriac Coupler (PC102)
- Turn OnIf Current: 15mA~50mA(Design: 16mA)
- High Repetitive Peak Off State Voltage: Min 600V
Summary of Contents for WORKCENTRE PE 220
Page 1: ...11 05 WORKCENTRE PE 220 SERVICE MANUAL 708P88337...
Page 4: ...Introduction ii 11 05 Workcentre PE 220 Page intentionally blank...
Page 14: ...Service Call Procedures 1 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 18: ...Status Indicator RAPs 2 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 46: ...Status Indicator RAPs 2 30 11 05 Workcentre PE 220 Page intentionally blank...
Page 48: ...Image Quality 3 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 64: ...Image Quality 3 18 11 05 Workcentre PE 220 Page intentionally blank...
Page 66: ...Repairs Adjustments 4 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 88: ...Repairs Adjustments 4 24 11 05 Workcentre PE 220 Page intentionally blank...
Page 90: ...Spare Parts List 5 2 11 05 Workcentre PE 220 PL 1 Main Assembly...
Page 92: ...Spare Parts List 5 4 11 05 Workcentre PE 220 PL 2 ADF Assembly...
Page 94: ...Spare Parts List 5 6 11 05 Workcentre PE 220 PL 3 Platen Cover Assembly...
Page 96: ...Spare Parts List 5 8 11 05 Workcentre PE 220 PL 4 ADF Platen Assembly...
Page 98: ...Spare Parts List 5 10 11 05 Workcentre PE 220 PL 5 OPE Unit...
Page 100: ...Spare Parts List 5 12 11 05 Workcentre PE 220 PL 6 Paper Path Assembly...
Page 102: ...Spare Parts List 5 14 11 05 Workcentre PE 220 PL 7 Fuser Unit...
Page 104: ...Spare Parts List 5 16 11 05 Workcentre PE 220 PL 8 Main Frame Assembly...
Page 106: ...Spare Parts List 5 18 11 05 Workcentre PE 220 PL 9 MP Tray Assembly...
Page 110: ...General Procedures Information 6 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 122: ...General Procedures and Information 6 14 11 05 Workcentre PE 220 Scanner Figure 2...
Page 127: ...General Procedures and Information Workcentre PE 220 11 05 6 19 LSU Figure 1 Figure 2...
Page 167: ...General Procedures and Information Workcentre PE 220 11 05 6 59 Service log...
Page 168: ...General Procedures and Information 6 60 11 05 Workcentre PE 220 Page intentionally blank...
Page 170: ...Wiring Diagrams 7 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 171: ...Wiring Diagrams Workcentre PE 220 11 05 7 3 WD 1 System Block Diagram...
Page 172: ...Wiring Diagrams 7 4 11 05 Workcentre PE 220 WD 2 PJ Locations...
Page 173: ...Wiring Diagrams Workcentre PE 220 11 05 7 5 WD 3 Connection Diagram 1 2...
Page 174: ...Wiring Diagrams 7 6 11 05 Workcentre PE 220 WD 4 Connection Diagram 2 2...
Page 175: ...Wiring Diagrams Workcentre PE 220 11 05 7 7 WD 5 Main Board 1 7...
Page 176: ...Wiring Diagrams 7 8 11 05 Workcentre PE 220 WD 6 Main Board 2 7...
Page 177: ...Wiring Diagrams Workcentre PE 220 11 05 7 9 WD 7 Main Board 3 7...
Page 178: ...Wiring Diagrams 7 10 11 05 Workcentre PE 220 WD 8 Main Board 4 7...
Page 179: ...Wiring Diagrams Workcentre PE 220 11 05 7 11 WD 9 Main Board 5 7...
Page 180: ...Wiring Diagrams 7 12 11 05 Workcentre PE 220 WD 10 Main Board 6 7...
Page 181: ...Wiring Diagrams Workcentre PE 220 11 05 7 13 WD 11 Main Board 7 7...
Page 182: ...Wiring Diagrams 7 14 11 05 Workcentre PE 220 WD 12 LIU...
Page 183: ...Wiring Diagrams Workcentre PE 220 11 05 7 15 WD 13 OPE...
Page 184: ...Wiring Diagrams 7 16 11 05 Workcentre PE 220 WD 14 LSU...
Page 185: ...Wiring Diagrams Workcentre PE 220 11 05 7 17 WD 15 ADF...
Page 186: ...Wiring Diagrams 7 18 11 05 Workcentre PE 220 WD 16 SMPS...
Page 187: ...Wiring Diagrams Workcentre PE 220 11 05 7 19 WD 17 HVPS 1 3...
Page 188: ...Wiring Diagrams 7 20 11 05 Workcentre PE 220 WD 18 HVPS 2 3...
Page 189: ...Wiring Diagrams Workcentre PE 220 11 05 7 21 WD 19 HVPS 3 3...
Page 190: ...Wiring Diagrams 7 22 11 05 Workcentre PE 220 Page intentionally blank...