Introduction
viii
11/05
Workcentre PE 220
8. Maintain continuous electrical contact between the ESD and the assembly into which it will be
installed, until completely plugged or soldered into the circuit.
9. Minimize bodily motions when handling unpackaged replacement ESDs. Normal motions, such
as the brushing together of clothing fabric and lifting one’s foot from a carpeted floor, can generate
static electricity sufficient to damage an ESD.
Super Capacitor or Lithium Battery Precautions
1. Exercise caution when replacing a super capacitor or Lithium battery. There could be a dan-
ger of explosion and subsequent operator injury and/or equipment damage if incorrectly
installed.
2. Be sure to replace the battery with the same or equivalent type recommended by the manu-
facturer.
3. Super capacitor or Lithium batteries contain toxic substances and should not be opened,
crushed, or burned for disposal.
4. Dispose of used batteries according to the manufacturers instructions.
Print Cartridge Service
Only print cartridges supplied by Xerox should be used. Printing defects or set damage caused by
the use of non-approved print cartridges or un-licensed toner refills are not covered by the guar-
antee.
Precautions on Safe-keeping of Print Cartridge
Excessive exposure to direct light for more than a few minutes may cause damage to the car-
tridge.
Service for the Life of Print Cartridge
If the printed image is light due to the toner supply becoming low you can temporarily improve the
print quality by redistributing the toner (Shake the print cartridge), however you should replace the
print cartridge to solve the problem permanently.
Redistributing Toner
When the print cartridge is near the end of its life, white streaks or light print occurs. The LCD dis-
plays the warning message, “Toner Low.” You can temporarily re-establish the print quality by re-
distributing the remaining toner in the cartridge.
Standard of guarantee for consumable parts.
Please refer to User Manual or Instructions on Fax/Printer Consumables SVC manual for the cri-
teria for judging the quality of consumable parts the standard of guarantee on those parts.
• Spotting a refilled cartridge by eye.
One way security screws are used in the manufacture of the cartridge – check if these are dam-
aged.
Summary of Contents for WORKCENTRE PE 220
Page 1: ...11 05 WORKCENTRE PE 220 SERVICE MANUAL 708P88337...
Page 4: ...Introduction ii 11 05 Workcentre PE 220 Page intentionally blank...
Page 14: ...Service Call Procedures 1 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 18: ...Status Indicator RAPs 2 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 46: ...Status Indicator RAPs 2 30 11 05 Workcentre PE 220 Page intentionally blank...
Page 48: ...Image Quality 3 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 64: ...Image Quality 3 18 11 05 Workcentre PE 220 Page intentionally blank...
Page 66: ...Repairs Adjustments 4 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 88: ...Repairs Adjustments 4 24 11 05 Workcentre PE 220 Page intentionally blank...
Page 90: ...Spare Parts List 5 2 11 05 Workcentre PE 220 PL 1 Main Assembly...
Page 92: ...Spare Parts List 5 4 11 05 Workcentre PE 220 PL 2 ADF Assembly...
Page 94: ...Spare Parts List 5 6 11 05 Workcentre PE 220 PL 3 Platen Cover Assembly...
Page 96: ...Spare Parts List 5 8 11 05 Workcentre PE 220 PL 4 ADF Platen Assembly...
Page 98: ...Spare Parts List 5 10 11 05 Workcentre PE 220 PL 5 OPE Unit...
Page 100: ...Spare Parts List 5 12 11 05 Workcentre PE 220 PL 6 Paper Path Assembly...
Page 102: ...Spare Parts List 5 14 11 05 Workcentre PE 220 PL 7 Fuser Unit...
Page 104: ...Spare Parts List 5 16 11 05 Workcentre PE 220 PL 8 Main Frame Assembly...
Page 106: ...Spare Parts List 5 18 11 05 Workcentre PE 220 PL 9 MP Tray Assembly...
Page 110: ...General Procedures Information 6 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 122: ...General Procedures and Information 6 14 11 05 Workcentre PE 220 Scanner Figure 2...
Page 127: ...General Procedures and Information Workcentre PE 220 11 05 6 19 LSU Figure 1 Figure 2...
Page 167: ...General Procedures and Information Workcentre PE 220 11 05 6 59 Service log...
Page 168: ...General Procedures and Information 6 60 11 05 Workcentre PE 220 Page intentionally blank...
Page 170: ...Wiring Diagrams 7 2 11 05 Workcentre PE 220 Page intentionally blank...
Page 171: ...Wiring Diagrams Workcentre PE 220 11 05 7 3 WD 1 System Block Diagram...
Page 172: ...Wiring Diagrams 7 4 11 05 Workcentre PE 220 WD 2 PJ Locations...
Page 173: ...Wiring Diagrams Workcentre PE 220 11 05 7 5 WD 3 Connection Diagram 1 2...
Page 174: ...Wiring Diagrams 7 6 11 05 Workcentre PE 220 WD 4 Connection Diagram 2 2...
Page 175: ...Wiring Diagrams Workcentre PE 220 11 05 7 7 WD 5 Main Board 1 7...
Page 176: ...Wiring Diagrams 7 8 11 05 Workcentre PE 220 WD 6 Main Board 2 7...
Page 177: ...Wiring Diagrams Workcentre PE 220 11 05 7 9 WD 7 Main Board 3 7...
Page 178: ...Wiring Diagrams 7 10 11 05 Workcentre PE 220 WD 8 Main Board 4 7...
Page 179: ...Wiring Diagrams Workcentre PE 220 11 05 7 11 WD 9 Main Board 5 7...
Page 180: ...Wiring Diagrams 7 12 11 05 Workcentre PE 220 WD 10 Main Board 6 7...
Page 181: ...Wiring Diagrams Workcentre PE 220 11 05 7 13 WD 11 Main Board 7 7...
Page 182: ...Wiring Diagrams 7 14 11 05 Workcentre PE 220 WD 12 LIU...
Page 183: ...Wiring Diagrams Workcentre PE 220 11 05 7 15 WD 13 OPE...
Page 184: ...Wiring Diagrams 7 16 11 05 Workcentre PE 220 WD 14 LSU...
Page 185: ...Wiring Diagrams Workcentre PE 220 11 05 7 17 WD 15 ADF...
Page 186: ...Wiring Diagrams 7 18 11 05 Workcentre PE 220 WD 16 SMPS...
Page 187: ...Wiring Diagrams Workcentre PE 220 11 05 7 19 WD 17 HVPS 1 3...
Page 188: ...Wiring Diagrams 7 20 11 05 Workcentre PE 220 WD 18 HVPS 2 3...
Page 189: ...Wiring Diagrams Workcentre PE 220 11 05 7 21 WD 19 HVPS 3 3...
Page 190: ...Wiring Diagrams 7 22 11 05 Workcentre PE 220 Page intentionally blank...